Netgear M4100-24G-POE Hardware Installation Guide - Page 14

Unpack the Hardware, Installation, Select a Location, Package Contents, Install the Switch

Page 14 highlights

NETGEAR Managed Switch You can also take the following steps to prevent damage from electrostatic discharge (ESD): 1. When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity from your body. 2. Before moving a sensitive component, place it in an antistatic container or package. 3. Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench pads, and an antistatic grounding strap. Unpack the Hardware Check the contents of the boxes to make sure that all items are present before installing the switch. 1. Place the container on a clean flat surface and cut all straps securing the container. 2. Unpack the hardware from the boxes. Carefully remove the hardware and place it on a secure and clean surface. For more information, see Select a Location on page 15. 3. Remove all packing material. 4. Make sure that all items are present. For more information, see Package Contents on page 13. Note: If any item is missing or damaged, contact your local NETGEAR reseller for replacement. 5. Inspect the products and accessories for damage. Report any damage immediately. Installation Install the equipment in the sequence presented in this section: 1. Select a location. For more information, see Select a Location on page 15. 2. Install the switch. For more information, see Install the Switch on page 16. 3. Check the installation. For more information, see Check the Installation on page 20. 4. Apply power and check the LEDs. Hardware Installation 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

Hardware Installation
14
NETGEAR Managed Switch
You can also take the following steps to prevent damage from electrostatic discharge (ESD):
1.
When unpacking a static-sensitive component from its shipping carton, leave it in the
antistatic package until you are ready to install it. Just before unwrapping the antistatic
package, discharge static electricity from your body.
2.
Before moving a sensitive component, place it in an antistatic container or package.
3.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads,
workbench pads, and an antistatic grounding strap.
Unpack the Hardware
Check the contents of the boxes to make sure that all items are present before installing the
switch.
1.
Place the container on a clean flat surface and cut all straps securing the container.
2.
Unpack the hardware from the boxes.
Carefully remove the hardware and place it on a secure and clean surface. For more
information, see
Select a Location
on page
15.
3.
Remove all packing material.
4.
Make sure that all items are present. For more information, see
Package Contents
on
page
13.
Note:
If any item is missing or damaged, contact your local NETGEAR
reseller for replacement.
5.
Inspect the products and accessories for damage.
Report any damage immediately.
Installation
Install the equipment in the sequence presented in this section:
1.
Select a location.
For more information, see
Select a Location
on page
15.
2.
Install the switch.
For more information, see
Install the Switch
on page
16.
3.
Check the installation.
For more information, see
Check the Installation
on page
20.
4.
Apply power and check the LEDs.