NordicTrack Elite 7.4 Bike English Manual - Page 9

Orient the Front Stabilizer 15 as shown. Attach

Page 9 highlights

3. Set a sturdy piece of packing material (not shown) under the front of the Frame (1). Have a 3 second person hold the Frame to prevent it from tipping while you complete this step. Orient the Front Stabilizer (15) as shown. Attach the Front Stabilizer to the Frame (1) with two M10 x 122mm Screws (65). Then, remove the packing material. 65 15 1 4. Orient the Upright (2) as shown. Have a second person hold the Upright near the front of the 4 Frame (1). Tie the lower end of the wire tie in the Upright (2) to the Main Wire (43) and to the Frame Pulse Wire (42) in the Frame (1). Then, pull the upper end of the wire tie until the wires are routed through the Upright (2). Tip: To prevent the Wires (42, 43) from falling into the Upright (2), secure the Wires with the wire tie. Wire Tie 43 Wire Tie 2 42 1 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

9
3.
Set a sturdy piece of packing material (not
shown) under the front of the Frame (1).
Have a
second person hold the Frame to prevent it
from tipping while you complete this step.
Orient the Front Stabilizer (15) as shown. Attach
the Front Stabilizer to the Frame (1) with two
M10 x 122mm Screws (65).
Then, remove the packing material.
1
3
65
15
4
2
42
43
1
Wire Tie
Wire
Tie
4.
Orient the Upright (2) as shown. Have a second
person hold the Upright near the front of the
Frame (1).
Tie the lower end of the wire tie in the Upright
(2) to the Main Wire (43) and to the Frame Pulse
Wire (42) in the Frame (1).
Then, pull the upper end of the wire tie until the
wires are routed through the Upright (2).
Tip: To prevent the Wires (42, 43) from falling
into the Upright (2), secure the Wires with the
wire tie.