NordicTrack Grt 500 English Manual - Page 15

Shooting And Maintenance

Page 15 highlights

29. Slide the four Tinnerman Clips (38) down over the 29 slots in the bracket on the Stabilizer (5). 38 5 38 30. Attach the upper end of the Shroud (56) to the two ÒLÓ-brackets on the Top Frame (1) with two 1/4Ó x 3/4Ó Bolts (17), two 1/4Ó Flat Washers (71), and two 1/4Ó Nylon Locknuts (25). Make sure that the indicated corner of the Shroud is lined up with the indicated corner of the Top Frame. The Bolts must be inserted through the square holes in the Shroud. Do not tighten the Bolts yet. 30 ÒLÓ-Brackets Align Corners 71 17 56 1 17 71 25 31. Attach the lower end of the Shroud (56) to the brack- 31 et on the Stabilizer (5) with four #8 x 3/4Ó Screws (32). The Screws must be inserted through the square holes in the Shroud and into the Tinnerman Clips (38). Note: For clarity, this step shows the Shroud (56) 38 as if step 30 had not yet been performed. 38 32 5 Bracket 32 32 56 32. Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in ADJUSTMENT, beginning on page 17 of this manual. Before using the training system, pull each cable a few times to make sure that the cables move smoothly over the pulleys. If one of the cables does not move smoothly, find and correct the problem. IMPORTANT: If the cables are not properly installed, they may be damaged when heavy weight is used. If there is any slack in the cables, you will need to remove the slack by tightening the cables. See TROUBLESHOOTING AND MAINTENANCE on page 19. 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25

15
29
38
38
5
29.
Slide the four Tinnerman Clips (38) down over the
slots in the bracket on the Stabilizer (5).
32.
Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in
ADJUSTMENT, beginning on page 17 of this manual.
Before using the training system, pull each cable a few times to make sure that the cables move smoothly
over the pulleys. If one of the cables does not move smoothly, find and correct the problem.
IMPORTANT: If
the cables are not properly installed, they may be damaged when heavy weight is used. If there is any
slack in the cables, you will need to remove the slack by tightening the cables. See TROUBLE-
SHOOTING AND MAINTENANCE on page 19.
30.
Attach the upper end of the Shroud (56) to the two
±L²-brackets on the Top Frame (1) with two 1/4² x 3/4²
Bolts (17), two 1/4² Flat Washers (71), and two 1/4²
Nylon Locknuts (25).
Make sure that the indicated
corner of the Shroud is lined up with the indicat-
ed corner of the Top Frame. The Bolts must be
inserted through the square holes in the Shroud.
Do not tighten the Bolts yet.
30
71
71
±L²-Brackets
1
25
17
56
31.
Attach the lower end of the Shroud (56) to the brack-
et on the Stabilizer (5) with four #8 x 3/4² Screws
(32). The Screws must be inserted through the
square holes in the Shroud and into the Tinnerman
Clips (38).
Note: For clarity, this step shows the Shroud (56)
as if step 30 had not yet been performed.
31
32
32
56
32
38
38
5
Bracket
Align
Corners
17