Weider Club C4800 English Manual - Page 15

the Short Weight Tube 24. Set a 50mm Washer

Page 15 highlights

25. Identify the Upper Short Stack Cable (63). 25 Attach the Cable inside the Top Frame (9) with an M10 x 65mm Bolt (80), two M10 Washers (99), 99 9 and an M10 Nylon Locknut (101). 101 99 63 80 26. Wrap the Upper Short Stack Cable (63) under a 100mm Pulley (38). Attach the Pulley and a Long Cable Trap (68) to the indicated hole in a "U"bracket (40) with an M10 x 50mm Bolt (81) and an M10 Nylon Locknut (101). Make sure the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 27. Route the Upper Short Stack Cable (63) up through the Top Frame (9) and over a 100mm Pulley (38). Attach the Pulley inside the Top Frame with an M10 x 65mm Bolt (80), two M10 Washers (99), two 12.5mm Spacers (69), and an M10 Nylon Locknut (101). 28. Route the Upper Short Stack Cable (63) over a 100mm Pulley (38) and down through the Top Frame (9). Attach the Pulley inside the Top Frame with an M10 x 65mm Bolt (80), two M10 Washers (99), two 12.5mm Spacers (69), and an M10 Nylon Locknut (101). 26 63 68 38 81 101 40 27 63 9 38 101 99 69 69 99 80 28 38 101 99 69 9 63 69 99 80 29. Set the tether on the other Weight Pin (98) over 29 the Short Weight Tube (24). Set a 50mm Washer (95) on the Weight Tube. Thread an M12 Nut (58) all the way onto the Upper Short Stack Cable (63). Screw the Cable partway into the Short Weight Tube (24). Tighten the Nut against the 50mm Washer (95). 63 98 58 95 24 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41

15
25.
Identify the Upper Short Stack Cable (63).
Attach the Cable inside the Top Frame (9) with an
M10 x 65mm Bolt (80), two M10 Washers (99),
and an M10 Nylon Locknut (101).
27. Route the Upper Short Stack Cable (63) up
through the Top Frame (9) and over a 100mm
Pulley (38). Attach the Pulley inside the Top
Frame with an M10 x 65mm Bolt (80), two M10
Washers (99), two 12.5mm Spacers (69), and an
M10 Nylon Locknut (101).
28. Route the Upper Short Stack Cable (63) over a
100mm Pulley (38) and down through the Top
Frame (9). Attach the Pulley inside the Top Frame
with an M10 x 65mm Bolt (80), two M10 Washers
(99), two 12.5mm Spacers (69), and an M10
Nylon Locknut (101).
29. Set the tether on the other Weight Pin (98) over
the Short Weight Tube (24). Set a 50mm Washer
(95) on the Weight Tube.
Thread an M12 Nut (58) all the way onto the
Upper Short Stack Cable (63). Screw the Cable
partway into the Short Weight Tube (24). Tighten
the Nut against the 50mm Washer (95).
26. Wrap the Upper Short Stack Cable (63) under a
100mm Pulley (38). Attach the Pulley and a Long
Cable Trap (68) to the indicated hole in a ā€œUā€-
bracket (40) with an M10 x 50mm Bolt (81) and
an M10 Nylon Locknut (101).
Make sure the
Cable Trap is oriented to hold the Cable in the
groove of the Pulley.
25
26
27
28
29
80
101
101
99
99
63
9
63
38
68
81
40
80
99
69
99
9
101
69
38
63
80
99
69
99
9
101
69
38
63
63
98
58
24
95