Weider Flex 450 English Manual - Page 19

Pulley, Brackets, Pulleys

Page 19 highlights

WEIDER HEALTH and FITNESS PAGE19 STEP 15 PULLEY BRACKETS PART NAME 101 5/1r X r HEX HEAD BOLT 105 5/16* NYLON LOCK NUT OTY 3 3 u Attach PEC-DECK PULLEY BRACKETS (43) and (44) to PEC-DECK ARMS (22) with 5/16" X 3" HEX HEAD BOLTS (101) and 5/16" LOCK NUT (105). (Bracket 43 has bolt hole off center to the right corner, 44 has hole off center to the left.) u Mount TOP MAST PULLEY BRACKET (45) into bracket on small welded square tube at the top d the ARM PRESS FRAME UPRIGHT (5) with 5/16" X 3' HEX HEAD BOLT (101) and 5/16" LOCK NUT (105). (This bracket has bolt hole centered in bracket.) Into this same square welded tube, press a 1 1/2" SQUARE PLASTIC CAP (73) into each end. 21 es) 131 73 • I) N 44 E:) 105 101 0 43 4:3 6) 101 22 STEP 16 PULLEYS PAritNAME 58 3112" PULLEY 106 3/8* X 13/4' HEX HEAD BOLT 111 3/r NYLON LOCK NUT wag 1 4 4 4 Bring PEC-DECK CABLE (53) up and set into 3 112" PULLEY (58) and bolt Pulley onto PULLEY BRACKET (45) on ARM PRESS UPRIGHT (5). u Trap cable into Pulley with CABLE TRAP BRACKET (42) and fasten with 3/8" X 1 3/4" HEX HEAD BOLT (106) and 3/8" NYLON LOCK NUT (111). Next fasten 3 1/2" PULLEYS (58) to PULLEY BRACKETS (43) and (44) while trapping cable into Pulleys with CABLE TRAPS (42). Bolt together with 3/8" X 1 3/4" HEX HEAD BOLTS (106) and 3/8" NYLON LOCK NUTS (111). 106 43 0 44 111 73 2 5 5 4za 111 42 58 106

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

WEIDER
HEALTH
and
FITNESS
PAGE
19
STEP
15
PULLEY
BRACKETS
PART
NAME
OTY
101
5/1r
X
r
HEX
HEAD
BOLT
3
105
5/16*
NYLON
LOCK
NUT
3
131
101
22
STEP
16
PULLEYS
0
21
I)
PArit
NAME
wag
1
58
3112"
PULLEY
4
106
3/8*
X
13/4'
HEX
HEAD
BOLT
4
111
3/r
NYLON
LOCK
NUT
4
Bring
PEC-DECK
CABLE
(53)
up
and
set
into
3
112"
PULLEY
(58)
and
bolt
Pulley
onto
PULLEY
BRACKET
(45)
on
ARM
PRESS
UPRIGHT
(5).
Trap
cable
into
Pulley
with
CABLE
TRAP
BRACKET
(42)
and
fasten
with
3/8"
X
1
3/4"
HEX
HEAD
BOLT
(106)
and
3/8"
NYLON
LOCK
NUT
(111).
Next
fasten
3
1/2"
PULLEYS
(58)
to
PULLEY
BRACKETS
(43)
and
(44)
while
trapping
cable
into
Pulleys
with
CABLE
TRAPS
(42).
Bolt
together
with
3/8"
X
1
3/4"
HEX
HEAD
BOLTS
(106)
and
3/8"
NYLON
LOCK
NUTS
(111).
Attach
PEC-DECK
PULLEY
BRACKETS
(43)
and
(44)
to
PEC-DECK
ARMS
(22)
with
5/16"
X
3"
HEX
HEAD
BOLTS
(101)
and
5/16"
LOCK
NUT
(105).
(Bracket
43
has
bolt
hole
off
center
to
the
right
corner,
44
has
hole
off
center
to
the
left.)
Mount
TOP
MAST
PULLEY
BRACKET
(45)
into
bracket
on
small
welded
square
tube
at
the
top
d
the
ARM
PRESS
FRAME
UPRIGHT
(5)
with
5/16"
X
3'
HEX
HEAD
BOLT
(101)
and
5/16"
LOCK
NUT
(105).
(This
bracket
has
bolt
hole
centered
in
bracket.)
Into
this
same
square
welded
tube,
press
a
1
1/2"
SQUARE
PLASTIC
CAP
(73)
into
each
end.
es)
105
44
43
4:3
43
0
106
6)
44
111
E:)
2
5
5
4za
101
73
73
N
111
42
5
8
106