Weider Pro 9648 English Manual - Page 13

Low Pulley 76, and the 3/8² Nylon Locknut

Page 13 highlights

22. See the inset drawing. Attach a 3 1/2Ó Pulley (15) and a Cable Trap (66) to the upper hole in a Long ÒUÓ-Bracket (57) with a 3/8Ó x 2Ó Bolt (12) and a 3/8Ó Nylon Locknut (21). Be sure that the Cable Trap is inside the Long ÒUÓBracket. Note: This may come pre-assembled. Route the High Cable (58) through the Long ÒUÓ-Bracket (57) and the 3 1/2Ó Pulley (15) shown in the inset drawing. Be sure that the Cable is in the groove of the Pulley and that the Cable and Pulley move smoothly. 23. Wrap the High Cable (58) around a 3 1/2Ó Pulley (15). Attach the Pulley to the bracket on the Top Frame (55) with a 3/8Ó x 2Ó Bolt (12) and a 3/8Ó Nylon Locknut (21). Be sure that the Cable is in the groove of the Pulley and that the Cable and Pulley move smoothly. 22 66 21 57 23 55 58 15 12 57 Bracket 58 15 58 12 15 CABLE ASSEMBLY 21 24. Note: This assembly step shows how to complete the assembly of several pre- 24 attached parts. The 5/8Ó x 9/16Ó Spacer (7) has been preattached on the outside of the 3 1/2Ó Low Pulley (76) for shipping purposes. Remove the 3/8Ó Nylon Locknut (21), the Spacer, and the Pulley from the 3/8Ó x 3 3/4Ó Bolt (88). Do not remove the Bolt. The Bolt has been shown removed for part identification. Reattach the 3 1/2Ó Low Pulley (76), with the 5/8Ó x 9/16Ó Spacer (7) between the Pulley and the Press Frame (17). Do not tighten the 3/8Ó Nylon Locknut (21) yet. Be sure that the 3/8Ó x 3 3/4Ó Bolt (88), the 3/8Ó Flat Washer (9), the 5/8Ó x 9/16Ó Spacer (7), the 3 1/2Ó Low Pulley (76), and the 3/8Ó Nylon Locknut (21) are oriented as shown. 13 9 88 7 17 76 21

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33

13
22.
See the inset drawing. Attach a 3 1/2° Pulley
(15) and a Cable Trap (66) to the upper hole in
a Long ²U°-Bracket (57) with a 3/8° x 2° Bolt
(12) and a 3/8° Nylon Locknut (21).
Be sure
that the Cable Trap is inside the Long ±U²-
Bracket. Note: This may come pre-assem-
bled.
Route the High Cable (58) through the Long
²U°-Bracket (57) and the 3 1/2° Pulley (15)
shown in the inset drawing.
Be sure that the
Cable is in the groove of the Pulley and that
the Cable and Pulley move smoothly.
23.
Wrap the High Cable (58) around a 3 1/2°
Pulley (15). Attach the Pulley to the bracket on
the Top Frame (55) with a 3/8° x 2° Bolt (12)
and a 3/8° Nylon Locknut (21).
Be sure that
the Cable is in the groove of the Pulley and
that the Cable and Pulley move smoothly.
24.
Note: This assembly step shows how to
complete the assembly of several pre-
attached parts.
The 5/8° x 9/16° Spacer (7) has been pre-
attached on the outside of the 3 1/2° Low
Pulley (76) for shipping purposes. Remove the
3/8° Nylon Locknut (21), the Spacer, and the
Pulley from the 3/8° x 3 3/4° Bolt (88).
Do not
remove the Bolt. The Bolt has been shown
removed for part identification.
Reattach the 3 1/2° Low Pulley (76), with the
5/8° x 9/16° Spacer (7) between the Pulley and
the Press Frame (17).
Do not tighten the 3/8²
Nylon Locknut (21) yet. Be sure that the
3/8² x 3 3/4² Bolt (88), the 3/8² Flat Washer
(9), the 5/8² x 9/16² Spacer (7), the 3 1/2²
Low Pulley (76), and the 3/8² Nylon Locknut
(21) are oriented as shown.
22
58
15
15
66
21
12
57
Bracket
55
21
12
15
58
23
24
CABLE ASSEMBLY
58
57
21
17
76
7
9
88