Weider Pro Xt55 English Manual - Page 7

Bases using M10 x 75mm Bolts 39, M10 Small

Page 7 highlights

3. Attach an Upright (1) to each Base (7) using two 3 Joint Plates (12), four M10 x 80mm Bolts (41), and four M10 Nylon Locknuts (11). Make sure the Uprights are oriented exactly as shown. Do not tighten the Nylon Locknuts yet. 1 41 7 1 12 12 4. Insert a Weight Guide (18) into the indicated hole in each Base (7). Attach the Weight Guides to the Bases using M10 x 75mm Bolts (39), M10 Small Washers (6), and M10 Nylon Locknuts (11). Do not tighten the Nylon Locknuts yet. 4 18 39 11 12 7 12 41 5. Press a 25mm Bushing (48) into each end of the Locking Bar (34). Slide the Barbell (35) into the Locking Bar. 7 6 6 11 18 11 39 6 76 5 48 34 35 48 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19

3.
Attach an Upright (1) to each Base (7) using two
Joint Plates (12), four M10 x 80mm Bolts (41), and
four M10 Nylon Locknuts (11). Make sure the
Uprights are oriented exactly as shown.
Do not
tighten the Nylon Locknuts yet.
3
1
1
41
12
12
7
7
12
12
11
41
7
4.
Insert a Weight Guide (18) into the indicated hole in
each Base (7). Attach the Weight Guides to the
Bases using M10 x 75mm Bolts (39), M10 Small
Washers (6), and M10 Nylon Locknuts (11).
Do not
tighten the Nylon Locknuts yet.
5.
Press a 25mm Bushing (48) into each end of the
Locking Bar (34). Slide the Barbell (35) into the
Locking Bar.
4
18
18
39
39
6
11
7
7
11
6
6
6
5
34
35
48
48