Belkin F1DA116Z User Manual - Page 14
Step 2 - user manual
UPC - 722868631249
View all Belkin F1DA116Z manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Installation Note: If this PRO3 KVM Switch will be daisy-chained to another KVM switch, set the BANK address prior to installing on a rack. Refer to the section in this User Manual titled "Connecting Multiple PRO3 KVM Switches (Daisy-Chaining)". Your PRO3 KVM Switch is now mounted securely into the bracket and you are ready to connect the console. Optional Bracket Installation (F1DA104Zea) The PRO3 4-Port KVM Switch can be installed into a 19-inch server rack using an optional OmniView Rack-Mount Kit (F1D005). Step 1 Attach the rack-mount bracket to your 4-Port PRO3 KVM Switch using the Phillips screws provided. (Refer to diagram below.) Step 2 Mount the 4-Port PRO3 KVM Switch to the rack-rail assembly. (Refer to diagram below.) 12
12
Installation
Note:
If this PRO3 KVM Switch will be daisy-chained to another KVM switch, set
the BANK address prior to installing on a rack. Refer to the section in this User
Manual titled “Connecting Multiple PRO3 KVM Switches (Daisy-Chaining)”.
Your PRO3 KVM Switch is now mounted securely into the bracket and you are
ready to connect the console.
Optional Bracket Installation (F1DA104Zea)
The PRO3 4-Port KVM Switch can be installed into a 19-inch server rack using
an optional OmniView Rack-Mount Kit (F1D005).
Step 1
Attach the rack-mount bracket to your 4-Port PRO3 KVM Switch using the
Phillips screws provided. (Refer to diagram below.)
Step 2
Mount the 4-Port PRO3 KVM Switch to the rack-rail assembly. (Refer to
diagram below.)