Belkin F1DA116Z User Manual - Page 26
Connecting the Servers, Step 1, Step 2 - reset
UPC - 722868631249
View all Belkin F1DA116Z manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Installation Connecting the Servers: Step 1: Connect all servers to the primary and secondary KVM switches. Refer to the "Connecting Servers to the PRO3 KVM Switch" section on page 16 for instructions. Step 2: Power up the secondary KVM switches sequentially, beginning with the highest BANK, by connecting each unit's power supply. Each KVM switch should display its corresponding BANK-address number as it is powered up. Step 3: Power up the primary switch. You should see the primary KVM switch light up and display the digits "00", indicating its BANK address. Note: If the PRO3 KVM Switches do not enumerate correctly, reset the primary KVM switch (BANK 00) by simultaneously pressing the "BANK +" and "BANK -" buttons. You can also reset the primary KVM switch to detect newly added secondary KVM switches. If the KVM switches still do not enumerate correctly, check that all KVM switches have the correct BANK address assigned to them and that all daisy-chain cables are connected properly. Step 4: Verify that the primary KVM switch has detected all secondary KVM switches by scrolling through the BANKs using the "BANK +" and "BANK -" buttons. If all secondary KVM switches are detected properly, the LED display on the primary KVM switch will register and display the BANK address of the attached secondary KVM switch. 24