Compaq BL10e HP ProLiant BL e-Class System Setup and Installation Guide - Page 48

Inserting the front of the rack rail and, engaging the locking gear

Page 48 highlights

Installing and Cabling the System 6. Compress the spring-loaded rack rail toward the rear of the rack (1). 7. Using the marks you made when measuring with the template, align the front of the right rail with the holes and release the rail, allowing it to lock into position (2). 8. Engage the locking gear (3). 2 3 1 Figure 3-9: Inserting the front of the rack rail and engaging the locking gear CAUTION: Rack rails must be installed as tightly as possible. Failure to obtain a correct fit may result in damage to equipment. Once the right rack rail is properly installed, begin installation of the left rack rail. 3-10 HP ProLiant BL e-Class System Setup and Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156

Installing and Cabling the System
6.
Compress the spring-loaded rack rail toward the rear of the rack (1).
7.
Using the marks you made when measuring with the template, align the front of
the right rail with the holes and release the rail, allowing it to lock into
position (2).
8.
Engage the locking gear (3).
3
2
1
Figure 3-9:
Inserting the front of the rack rail and
engaging the locking gear
CAUTION:
Rack rails must be installed as tightly as possible. Failure to obtain a
correct fit may result in damage to equipment.
Once the right rack rail is properly installed, begin installation of the left rack rail.
3-10
HP ProLiant BL e-Class System Setup and Installation Guide