Electrolux EIED55HIW Installation Instructions (All Languages) - Page 14

Gas connection - 27

Page 14 highlights

14 Installation Instructions Gas connection 1. Remove the shipping cap from gas pipe at the rear of the dryer. IMPORTANT DO NOT connect the dryer to L.P. gas service without converting the gas valve. An L.P. conversion kit must be installed by a qualified gas technician. 2. Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or approved pipe from gas supply line to the 3/8 inch (0.96 cm) pipe located on the back of the dryer. Use a 1/2 inch to 3/8 inch (1.27 cm to 0.96 cm) reducer for the connection. Apply an approved thread sealer that is resistant to the corrosive action of liquefied gases on all pipe connections. Manual Shutoff Flare Valve Union GAS FLOW Flare Union Closed Nipple Open Flexible Connector Inlet Pipe on Back of Dryer All connections must be wrench-tightened 3. Open the shutoff valve in the gas supply line to allow gas to flow through the pipe. Wait a few minutes for gas to move through the gas line. to dryer Shutoff Valve Open position from gas supply 4. Check for gas system leaks with a manometer. If a manometer is not available, test all connections by brushing on a soapy water solution. WARNING EXPLOSION HAZARD NEVER test for gas leaks with an open flame. IMPORTANT The supply line must be equipped with an approved manual shutoff valve. This valve should be located in the same room as the dryer and should be in a location that allows ease of opening and closing. Do not block access to the gas shutoff valve.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76

14
Installation Instructions
Gas connection
Remove the shipping cap from gas pipe at the
1.
rear of the dryer.
IMPORTANT
The supply line must be equipped with an
approved manual shutoff valve. This valve
should be located in the same room as the dryer
and should be in a location that allows ease of
opening and closing. Do not block access to the
gas shutoff valve.
Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or
2.
approved pipe from gas supply line to the 3/8
inch (0.96 cm) pipe located on the back of the
dryer. Use a 1/2 inch to 3/8 inch (1.27 cm to
0.96 cm) reducer for the connection. Apply an
approved thread sealer that is resistant to the
corrosive action of liquefied gases on all pipe
connections.
Open the shutoff valve in the gas supply line to
3.
allow gas to flow through the pipe. Wait a few
minutes for gas to move through the gas line.
IMPORTANT
DO NOT connect the dryer to L.P. gas service
without converting the gas valve. An L.P.
conversion kit must be installed by a qualified
gas technician.
WARNING
EXPLOSION HAZARD
NEVER test for gas leaks with an open flame.
All connections must be wrench-tightened
Flare
Union
Flare
Union
GAS FLOW
Manual
Shutoff
Valve
Closed
Open
Flexible
Connector
Inlet Pipe on
Back of Dryer
e
l
p
p
i
N
Shutoff Valve -
Open position
to dryer
from gas supply
Check for gas system leaks with a manometer.
4.
If a manometer is not available, test all
connections by brushing on a soapy water
solution.