Haier AB072XCEAA Service Manual - Page 27
In, ge pi, 1.6. C
View all Haier AB072XCEAA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
Chff^j\bZe Abj Chg]blbhg^j 8.1.4. Installation of water drainage pipe (1) Install water drainage pipe Pipe diameter shall be equal or larger than that of connecting pipe (Pipe of polythene; size: 25mm; O.D.: 32mm ) Drainpipe should be short, with a downward slope at least 1/100 to prevent air bag from forming. If downward slope of drainpipe cannot be made,lifting pipe shall be installed. Keep a distance of 1-1.5m between suspending bolts, to make water hose straight. 1- 1. 5m slope over 1/100 Use the drainage hose and clip provided with unit. Insert water pipe into water plug until it reaches the white tape. Tighten the clip until head of the screw is less than 4mm from hose. Wind the drainage hose to the clip using seal pad for heat insulation. Insulate drainage hose in the room. Large size seal pad Clip (accessory) Clip Tape(white) Draingage hose 4mm below 8.1.6. Cautions for the water drainage lifting pipe Installation height of water drainage lifting pipe shall be less than 280mm There should be a right angle with unit ,300mm from unit. 300mm below 1-1.5m Suspending bracket 280mm unter Drainage hose Water drainage lifting pipe Drainage hose Clip 220mm < Note > The slope of water drainage hose shall be within 75mm , make the drainage plug not to bear excessive force. If several water hoses join together, of as per following procedures. Slope below 1/100 Connection drainage hose with a T-joint Specifications of the selected drainage hoses shall meet the requirements for the unit running z 25 z