Haier AB072XCEAA Service Manual - Page 32
Cover of controll box, PCB on, indoor unit, Terminal block
View all Haier AB072XCEAA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
(2) Check if water drainage is smooth after installation. Chff^j\bZe Abj Chg]blbhg^j Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage. After wiring Check water drainage in cooling operation. When wiring is not complete Remove cover of control box, short connect "CHECK" terminal of the indoor unit, which is on the uper part of indoor unit PCB. Connect 1PH power to terminal 1 and 2 on terminal block. Note, in this operation, fan will be running. Upon confirmation of a smooth water drainage, be sure to cut off power supply and remove short connection of "CHECK" terminal. Maintenance Method of water charging Self-provided stiff pipe Inspecting hole Water drainage port for maintenance (Drain water from this hole) 100mm Watering can of plastic pipe should be about 100 mm long Charge water from inspecting hole Charge water from air outlet PCB on indoor unit Terminal block Cover of controll box z 30 z