Haier AB072XCEAA Service Manual - Page 45
Installation Precedure
View all Haier AB072XCEAA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 45 highlights
Chff^j\bZe Abj Chg]blbhg^j 8.4. Installation Precedure(For AF***XCEAA) more than more than more than Fig1 330 more than 617 Fig2 Fig3 Tool necessary 1. Screw driver 2. Hacksaw 3. 70mm dia.hole core drill 4. Spanner(dia. 17,27mm) 5. Spanner(14,17,27mm) 6. Pipe cutter 7. Flaring tool 8. Knife 9. Nipper 10. Gas leakage detector or soap water 11. Measuring tape 12. Reamer 13. Refrigerant oil Standard accessories Following parts shall be field supplied Mark A B C D E F Part name Adhensive tape Pipe clip Connecting hose Insulation material Putty Drain hose Selection of installation place Place where it is easy to route drainage pipe and outdoor piping. Place ,away from heat source and with less direct sunlight. Place where cool and warm air could be delivered evently to every corner of the room. Place near power supply socket.Leave enough space around the unit. Place ,robust not causing vibration,where the body can be supported sufficiently. To prevent interference, place it at least 1m away from other electric machines, such as TV set, radio. Installing According to the dimension of the figure 2 shown, nail two cement steel nails on the wall,Keep 2~3 mm out.then hang the back of the unit on them. There must be no gap between the indoor unit and wall. Remove the front panel,then use two expansible screws to fix the unit on the floor.As figure 3 shown. Once refrigerant piping and drain piping connections are complete,fill the gap of the throght hole with putty. Attach the front panel and front grille in their orginal positions once all connections are complete. No. Shape and description QTY Remote controller Expansion bushing Self-tapping screw Wall hole cover Dry battery #7 Cement steel nail 6 Note: There isn't connecting wire with this unit. Fixing the unit 1. Position of the wall hole Wall hole should be decided according to installation place and piping direction.(refer to installation drawings). 2. Making a wall hole z 43 z