Haier AB122ACERA Service Manual - Page 23

Caution - washer

Page 23 highlights

Commercial Air Conditioner Model: AU122AEERA AB122ACERA AC122ACERA AD122ALERA CAUTION Install the drain hose at the rear; it should not be installed on the top or right side. After the piping and drainage exit has been selected, drill 80mm and 50mm or 150mm dia. hole through the wall. So that the hole is slanting downward toward the outside for smooth water flow if a condensate pump is not fitted to system. Wall 6mm 4. INSTALLING INDOOR UNIT Reset the hex bolts as shown in Fig.14. Fig. 14 Indoor unit Hex bolt 8 to 13mm 2. DRILLING HOLES FOR ANCHOR BOLTS AND INSTALLING THE ANCHOR BOLTS using a masonry drill, drill four 12.5 mm dia. Holes.(Fig.11) Fig. 11 Fig. 11 12.5mm Insert the anchor bolts into the drilled holes, and drive the pins completely into the anchor bolts with a hammer. (Fig. 12) Fig. 12 3. INSTALLING BRACKETS Install the brackets with nuts, washers and spring washers.(Fig. 13) Fig. 13 Apply the indoor unit to the brackets.(Fig.15) Fig. 15 Bolt Bracket Indoor unit Now, securely tighten the hex bolts in both sides. 5. INSTALL THE DRAIN HOSE The drain hose will be connected to the right side.(Fig.3) Insert the drain hose into the drain pan, then secure the drain hose with a nylon fastener.(Fig.5) Wrap the insulation (drain hose)around the drain hose connection. (Fig.9) Be sure to arrange the drain hose correctly so that it is lower than the drain hose connecting port of the indoor unit (Fig.16) if condensate pump is not fitted to system. Fig. 16 Remove the hole cover. Spring washer Special nut Bracket Arrange the drain hose lower than this portion OK 10 18 7.5 7.5 18 10 68 16 21 28 26.5 232 4-R5 4-R5 381 26.5 2-R2.5 2-R2.5 26.5 381 232 26.5 28 21 16 68 23 Drain hose NO

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63

68
16 21
28
381
232
26.5
26.5
2-R2.5
10
18
7.5
4-R5
68
16
21
28
381
232
26.5
26.5
2-R2.5
10
18
7.5
4-R5
Wall
6mm
12.5mm
Fig. 12
Fig. 13
Spring washer
Special nut
Bracket
CAUTION
Hex bolt
8 to 13mm
Indoor unit
Fig. 14
Fig. 16
Remove the hole cover.
OK
Arrange the drain hose
lower than this portion
Drain hose
NO
Fig. 15
Bolt
Bracket
Indoor unit
Install the drain hose at the rear; it should not be
installed on the top or right side.
After the piping and drainage exit has been selected,
drill 80mm and 50mm or 150mm dia. hole through the
wall. So that the hole is slanting downward toward the
outside for smooth water flow if a condensate pump is
not fitted to system.
4. INSTALLING INDOOR UNIT
Reset the hex bolts as shown in Fig.14.
Apply the indoor unit to the brackets.(Fig.15)
Now, securely tighten the hex bolts in both sides.
5. INSTALL THE DRAIN HOSE
The drain hose will be connected to the right side.(Fig.3)
Insert the drain hose into the drain pan, then secure the
drain hose with a nylon fastener.(Fig.5)
Wrap the insulation (drain hose)around the drain hose
connection. (Fig.9)
Be sure to arrange the drain hose correctly so that it is
lower than the drain hose connecting port of the indoor
unit (Fig.16) if condensate pump is not fitted to system.
Insert the anchor bolts into the drilled holes, and drive
the pins completely into the anchor bolts with a
hammer. (Fig. 12)
3.
INSTALLING BRACKETS
Install the brackets with nuts, washers and spring
washers.(Fig. 13)
2.
DRILLING HOLES FOR ANCHOR BOLTS AND
INSTALLING THE ANCHOR BOLTS
using a masonry drill, drill four 12.5 mm dia.
Holes.(Fig.11)
Fig. 11
Commercial Air Conditioner
Model: AU122AEERA AB122ACERA
AC122ACERA AD122ALERA
2
3