HP 200 HP StorageWorks 200 Storage Virtualization System owner's guide (AE071- - Page 39
Planned power off, outage will affect the system, contact your HP support representative to schedule
View all HP 200 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 39 highlights
Planned power off Occasionally, you may need to plan a site power outage, such as during alterations to the data center, inspections, or work by the electric company. If a scheduled power outage will affect the system, contact your HP support representative to schedule a planned power off. CAUTION: Only a trained HP support representative can shut down and power off the system. Do not attempt to power down the system other than during an emergency. HP StorageWorks 200 Storage Virtualization System owner's guide 39
Planned power off
Occasionally, you may need to plan a site power outage, such as during alterations
to the data center, inspections, or work by the electric company. If a scheduled power
outage will affect the system, contact your HP support representative to schedule a
planned power off.
CAUTION:
Only a trained HP support representative can shut down and power off the system.
Do
not attempt to power down the system other than during an emergency.
HP StorageWorks 200 Storage Virtualization System owner’s guide
39