HP 3PAR StoreServ 7200 2-node HP 3PAR StoreServ 7000 Storage Service Guide (QR - Page 21
Node Verification, SFP Repair, Summary, Health, State, Controller Nodes
View all HP 3PAR StoreServ 7200 2-node manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
Node Verification 1. Verify the node is installed successfully: a. Under the Systems tree in the left panel, double click the storage system just serviced. b. In the lower, right of the Summary tab, in the Health section, check the State status is Normal. NOTE: If the state is not normal contact your ASP for further assistance. Figure 20 Verifying the Node Status 2. Select Controller Nodes. The Status LED for the replaced node may indicate green and take up to 3 minutes to change to green blinking (see Figure 21 (page 21)). Figure 21 Replaced Node Status LED SFP Repair The SFP is located in the port on the controller node HBA/CNA and there are two to six SFPs per node. Before you begin, use either SPMAINT or the HP 3PAR Management Console to identify the failed SFP. SFP Identification 1. Under the Systems tree in the left panel, select the storage system to be serviced. 2. On the Summary tab, click the Port link to open the port's tab. SFP Repair 21