HP 8/20q HP StorageWorks 8/20q Fibre Channel Switch installation and reference - Page 30
Collect the required items, Verify the kit contents
View all HP 8/20q manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 30 highlights
Collect the required items NOTE: The rack mount kit installation requires one technician. Locate the following items and set them aside: • 8/20q Fibre Channel Switch • 8/20q Fibre Channel Switch rack-mount kit • Smaller items, such as screws, ship in plastic bags in the kit. See Table 7. Required tools: • #2 Phillips screwdriver • 7/16-inch wrench Verify the kit contents Check the contents of the 8/20q Fibre Channel Switch rack mount kit shipping carton to verify that all required parts and hardware are available (Table 7). Table 7 8/20q Fibre Channel Switch rack mount kit hardware Item Description Two (2) rear mounting brackets Two (2) switch rails One (1) filler panel (optional), see step 7. Ten (10) M6 machine screws Ten (10) M6 cage-nuts for square rack holes Ten (10) M6 cage-nuts for round rack holes Four (4) 10-32 x .375-inch screws with captive washers Two (2) 1/4-20 hex nuts with lock washers Two (2) 1/4-inch flat washers 30