HP 8/20q HP StorageWorks 8/20q Fibre Channel Switch installation and reference - Page 32

HP 8/20q Manual

Page 32 highlights

5. Fasten each rail flange to the front of the rack using two M6 machine screws (Figure 10). Figure 10 Fastening the rail to the front of the rack 6. Fasten each slotted-rail end to the rear mounting bracket using a flat washer and a 1/4-20 hex nut (Figure 11). Figure 11 Fastening the rail to the rear mounting bracket 7. Optional: Fasten the filler panel to the rear mounting brackets with two M6 machine screws (Figure 12). Figure 12 Installing the filler panel 32

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72

32
5.
Fasten each rail flange to the front of the rack using two M6 machine screws (
Figure 10
).
Figure 10
Fastening the rail to the front of the rack
6.
Fasten each slotted-rail end to the rear mounting bracket using a flat washer and a 1/4-20 hex nut
(
Figure 11
).
Figure 11
Fastening the rail to the rear mounting bracket
7.
Optional: Fasten the filler panel to the rear mounting brackets with two M6 machine screws (
Figure 12
).
Figure 12
Installing the filler panel