HP Cisco MDS 9216A Cisco MDS 9500 Series Hardware Installation Guide (OL-17467 - Page 198

Cabinet and Rack Requirements for the Cisco MDS 9513 Chassis

Page 198 highlights

Cabinet and Rack Requirements Appendix C Cabinet and Rack Installation Send documentation comments to [email protected]. Cabinet and Rack Requirements for the Cisco MDS 9513 Chassis The cabinet or rack must also meet the following requirements for the Cisco MDS 9513 chassis: • The minimum vertical rack space per chassis: - Cisco MDS 9513 chassis: 24.5 inches (62.2 cm) or 14 RU, height with required rack mount support is 15 RU. • The distance between the rack-mounting rails for four-post EIA racks must be at least 26.56 inches (67.46 cm). For more information, see "Installing the Cisco MDS 9513 Director in a Rack" section on page 2-7. • The minimum spacing for four-post EIA cabinets (perforated or solid-walled): - To ensure the minimum bend radius for fiber-optic cables, the front mounting rails of the cabinet should be offset from the front door by a minimum of 3 inches (7.6 cm), and a minimum of 5 inches (12.7 cm) if cable management brackets are installed on the front of the chassis. - A minimum of 4.0 inches (10.16 cm) of clear space between the side edge of the chassis and the side wall of the cabinet. No sizeable flow obstructions should be immediately in the way of the chassis air intake or exhaust vents. Note Optional jumper power cords are available for use in a cabinet. See the "Jumper Power Cord" section on page E-11. Cabinet and Rack Requirements for the Cisco MDS 9509 and Cisco MDS 9506 Chassis The cabinet or rack must also meet the following requirements: • The minimum vertical rack space per chassis: - Cisco MDS 9509 chassis: 24.5 inches (62.2 cm) or 14 RU - Cisco MDS 9506 chassis: 12.25 inches (31.1 cm) or 7 RU (rack unit) • The width between the rack-mounting rails must be at least 17.75 inches (45.1 cm). For four-post EIA racks, this is the distance between the two front rails and rear rails. • The minimum spacing for four-post EIA cabinets (perforated or solid-walled): - To ensure the minimum bend radius for fiber-optic cables, the front mounting rails of the cabinet should be offset from the front door by a minimum of 3 inches (7.6 cm), and a minimum of 5 inches (12.7 cm) if cable management brackets are installed on the front of the chassis. - A minimum of 2.5 inches (6.4 cm) of clear space between the side edge of the chassis and the side wall of the cabinet. No sizeable flow obstructions should be immediately in the way of the chassis air intake or exhaust vents. Note Optional jumper power cords are available for use in a cabinet. See the "Jumper Power Cord" section on page E-11. Cisco MDS 9500 Series Hardware Installation Guide C-2 OL-17467-02

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288

Send documentation comments to [email protected].
C-2
Cisco MDS 9500 Series Hardware Installation Guide
OL-17467-02
Appendix C
Cabinet and Rack Installation
Cabinet and Rack Requirements
Cabinet and Rack Requirements for the Cisco MDS 9513 Chassis
The cabinet or rack must also meet the following requirements for the Cisco MDS 9513 chassis:
The minimum vertical rack space per chassis:
Cisco MDS 9513 chassis: 24.5 inches (62.2 cm) or 14 RU, height with required rack mount
support is 15 RU.
The distance between the rack-mounting rails for four-post EIA racks must be at least 26.56 inches
(67.46 cm). For more information, see
“Installing the Cisco MDS 9513 Director in a Rack” section
on page 2-7
.
The minimum spacing for four-post EIA cabinets (perforated or solid-walled):
To ensure the minimum bend radius for fiber-optic cables, the front mounting rails of the cabinet
should be offset from the front door by a minimum of 3 inches (7.6 cm), and a minimum of
5 inches (12.7 cm) if cable management brackets are installed on the front of the chassis.
A minimum of 4.0 inches (10.16 cm) of clear space between the side edge of the chassis and the
side wall of the cabinet. No sizeable flow obstructions should be immediately in the way of the
chassis air intake or exhaust vents.
Note
Optional jumper power cords are available for use in a cabinet. See the
“Jumper Power Cord” section on
page E-11
.
Cabinet and Rack Requirements for the Cisco MDS 9509 and Cisco MDS 9506 Chassis
The cabinet or rack must also meet the following requirements:
The minimum vertical rack space per chassis:
Cisco MDS 9509 chassis: 24.5 inches (62.2 cm) or 14 RU
Cisco MDS 9506 chassis: 12.25 inches (31.1 cm) or 7 RU (rack unit)
The width between the rack-mounting rails must be at least 17.75 inches (45.1 cm). For four-post
EIA racks, this is the distance between the two front rails and rear rails.
The minimum spacing for four-post EIA cabinets (perforated or solid-walled):
To ensure the minimum bend radius for fiber-optic cables, the front mounting rails of the cabinet
should be offset from the front door by a minimum of 3 inches (7.6 cm), and a minimum of
5 inches (12.7 cm) if cable management brackets are installed on the front of the chassis.
A minimum of 2.5 inches (6.4 cm) of clear space between the side edge of the chassis and the
side wall of the cabinet. No sizeable flow obstructions should be immediately in the way of the
chassis air intake or exhaust vents.
Note
Optional jumper power cords are available for use in a cabinet. See the
“Jumper Power Cord” section on
page E-11
.