HP Visualize J5000 hp Visualize J5000 to J5600 workstation PA8600 upgrade inst - Page 30
Verifying System Operations
View all HP Visualize J5000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 30 highlights
Wrapping Up Verifying System Operations Verifying System Operations To verify the system operation, follow these steps: 1. Reconnect the power cables and any other cables that were disconnected when opening the workstation. 2. Reconnect all peripheral devices and their associated power cables. 3. Verify that the terminators are reattached where necessary. 4. Power-on the system (push the power button on the front panel). 5. The console will prompt you to set the LAN ID which was recorded earlier. It is also next to the serial number label. 6. Reset the BCH path numbers if they are different than the defaults. 7. If the console screen fails to come up, set up a serial terminal on COM1 and remove the keyboard to force the console to COM1. 8. If the system fails to boot or power up, refer to the Solving Problems chapter of the J5000/J7000 Owner's Guide. If you have any questions, suggestions, or problems with our hardware or documentation, please contact your designated Hewlett-Packard representative. 30 Chapter 3