Honeywell DH65DG115 User Guide - Page 11

Cleaning

Page 11 highlights

TrueDRY DH65 Cleaning On an annual basis, maintenance is required to ensure TrueDRY runs at peak efficiency. Unplug TrueDRY DH65 before beginning ser- 1 vice. Grip and remove thumb screws (4 per collar) and slide collars off. Grip filter tab at bottom to remove. 2 Replace with new filter. M27334 Using a 1/2-in. hex drive or standard screw- Check the drain connection and drain line 3 driver, remove the eight screws on either side of the TrueDRY DH65. The side and 4 to ensure it is clear of debris and sludge. Ensure all hose connections are secure once top panels can then be removed. Using a maintenance of the drain lines is complete. damp cloth, wipe excess dust and debris from blower, refrigerant coils, and compres- sor coils. Reattach panels and collars when finished. 69-2089EFS_D.indd 9 When service is complete, initiate a call for 5 dehumidification and check that the compressor and fan activate. If using the digital VisionPRO IAQ or TrueIAQ controls, reset maintenance reminders. M27335 9 69-2089EFS-08 9/22/2008 10:02:41 AM

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

TrueDRY DH65
9
69-2089EFS—08
On an annual basis, maintenance is required to ensure TrueDRY runs at peak efficiency.
Cleaning
1
2
3
4
M27334
M27335
Unplug TrueDRY DH65 before beginning ser
-
vice. Grip and remove thumb screws (4 per
collar) and slide collars off.
Grip filter tab at bottom to remove.
Replace with new filter.
Using a 1/2-in. hex drive or standard screw
-
driver, remove the eight screws on either
side of the TrueDRY DH65. The side and
top panels can then be removed. Using a
damp cloth, wipe excess dust and debris
from blower, refrigerant coils, and compres
-
sor coils. Reattach panels and collars when
finished.
5
When service is complete, initiate a call for
dehumidification and check that the com-
pressor and fan activate. If using the digital
VisionPRO IAQ or TrueIAQ controls, reset
maintenance reminders.
Check the drain connection and drain line
to ensure it is clear of debris and sludge.
Ensure all hose connections are secure once
maintenance of the drain lines is complete.
69-2089EFS_D.indd
9
9/22/2008
10:02:41 AM