Intel SBX82 User Guide - Page 57

Completing the installation

Page 57 highlights

8. Close the blade server cover (see "Closing the blade server cover" on page 45). Statement 21: xx CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade cover before installing the blade server. 9. Reinsert the blade server into the bay in the SBCE unit. 10. Turn on the blade server. 11. Start the blade server Configuration/Setup Utility program and set configuration parameters as needed (see "Using the Configuration/Setup Utility program" on page 49 for information). Completing the installation To complete the installation, complete the following tasks. Instructions for each task are in the following sections. 1. Reinstall the blade server bezel assembly, if you removed it (see "Installing the blade server bezel assembly"). 2. Close the blade server cover, unless you installed an expansion unit option (see "Closing the blade server cover" on page 45). Statement 21: xx CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade cover before installing the blade server. 3. Reinstall the blade server into the SBCE unit (see "Installing the blade server in the SBCE unit" on page 46). 4. Turn on the blade server (see "Turning on the blade server" on page 11). 5. For certain options, run the blade server Configuration/Setup Utility program (see "Updating your blade server configuration" on page 47). ✏ NOTE If you have just connected the power cords of your SBCE unit to electrical outlets, you must wait until the power-on LED on the blade server flashes slowly before pressing the powercontrol button on a blade server. 43

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

43
8.
Close the blade server cover (see “Closing the blade server cover” on page 45).
Statement 21:
xx
CAUTION:
Hazardous energy is present when the blade server is connected to the power source.
Always replace the blade cover before installing the blade server.
9.
Reinsert the blade server into the bay in the SBCE unit.
10.
Turn on the blade server.
11.
Start the blade server Configuration/Setup Utility program and set configuration parameters as
needed (see “Using the Configuration/Setup Utility program” on page 49 for information).
Completing the installation
To complete the installation, complete the following tasks. Instructions for each task are in the
following sections.
1.
Reinstall the blade server bezel assembly, if you removed it (see “Installing the blade server
bezel assembly”).
2.
Close the blade server cover, unless you installed an expansion unit option (see “Closing the
blade server cover” on page 45).
Statement 21:
xx
CAUTION:
Hazardous energy is present when the blade server is connected to the power source.
Always replace the blade cover before installing the blade server.
3.
Reinstall the blade server into the SBCE unit (see “Installing the blade server in the SBCE unit”
on page 46).
4.
Turn on the blade server (see “Turning on the blade server” on page 11).
5.
For certain options, run the blade server Configuration/Setup Utility program (see “Updating
your blade server configuration” on page 47).
NOTE
If you have just connected the power cords of your SBCE unit to electrical outlets, you must
wait until the power-on LED on the blade server flashes slowly before pressing the power-
control button on a blade server.