Intel SBX82 User Guide - Page 80
Light Path Diagnostics table
UPC - 675900686984
View all Intel SBX82 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 80 highlights
NMI MIS SBRD TEMP Power is available to relight the Light Path Diagnostics LEDs for a short period of time after the blade server is removed from the SBCE unit. During that time, you can relight the Light Path DIagnostics LEDS for up to 25 seconds or less, depending on the number of LEDs that are lit and the length of time the blade server is removed from the SBCE unit. Light Path Diagnostics table Use Table 7 to help determine the cause of the error and the action you should take. Power is available to relight the Light Path Diagnostics LEDs for a small period of time after the blade server is removed from the SBCE unit. During that period of time, you can relight the Light Path Diagnostics LEDs for a maximum of 25 seconds (or less, depending on the number of LEDs that are lit and the length of time the blade server is removed from the SBCE unit) by pressing the Light Path Diagnostics button. The Light Path Diagnostics power present LED (CR111) lights when the Light Path Diagnostics button is pressed if power is available to relight the blade-error LEDs. If the Light Path Diagnostics power present LED does not light when the Light Path Diagnostics button is pressed, no power is available to light the blade-error LEDs, and they will be unable to provide any diagnostic information. 66 Intel Server Compute Blade SBX82 Installation and User's Guide