LG L1404R Service Manual - Page 8
How to Install
View all LG L1404R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
Installation How to Install When Using Installation Kits 1. Window Requirements This unit is designed for installation in standard double hung windows with actual opening widths from 29" to 41". The top and bottom window sash must open sufficiently to allow a clear vertical opening of 16" from the bottom of the upper sash to the window stool. 2. Installation Kits Contents 29" to 41" 18" min Stool Interior wall 26" min (Without frame curtain) Offset Less 11/4" Sill Exterior 1 2 3 4 5 6 7 8 11 9 10 13 12 s Top retainer bar is in the product package. NO. NAME OF PARTS Q'TY 1 FRAME CURTAIN 2 2 SILL SUPPORT 2 3 BOLT 2 4 NUT 2 5 SCREW(TYPE A) (10mm(2/5")) 16 6 SCREW(TYPE B) D5.1mm(0.2")/16mm(0.63") 3 7 SCREW(TYPE C) D4.1mm(0.17")/16mm(0.63") 5 8 FOAM-STRIP 1 9 FOAM-PE (600mm x 25mm x 2mm) 1 10 WINDOW LOCKING BRACKET 1 11 FOAM-PE (920mm x 30mm x 2mm) 1 12 DRAIN PIPE 1 13 FRAME GUIDE 2 8 Room Air Conditioner