LG LBC24360ST Service Manual - Page 61

Power, Compressor, Freezer fan, Defrosting, heater ON, heater OFF, Pillar, Pillar, Total load

Page 61 highlights

13-1-9 Electrical Parts Are Turned On Sequentially Electrical parts such as compressor, defrosting heater, freezer fan, etc. are turned on in the following order to prevent noise and parts damage. Several parts are started at the same time at initial power on and are turned off together when test is completed. Initial power in Temperature of defrosting OPERATING Temperature of defrosting sensor is 45°C or more (when unit is newly purchased or when moved) sensor is lower than 45°C (during power outages or for service) ORDERS Power ON in 0.5 sec. Compressor ON in 0.5 sec. Freezer fan ON Power in 0.5 sec. ON Defrosting heater ON in 0.5 sec. **Pillar heater ON in 5 sec. in 10 sec. Defrosting heater OFF Pillar in 11 sec. heater OFF Compressor in 0.5 sec. ON Freezer fan ON Reset to normal operation from test mode Total load In 7 min. Compressor In 10 min. ON ON Freezer fan ON **Pillar Heater only apply in 3D/4D Models. 61

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69

13-1-9 Electrical Parts Are Turned On Sequentially
Electrical parts such as compressor, defrosting heater, freezer fan, etc. are turned on in the following order to prevent noise
and parts damage. Several parts are started at the same time at initial power on and are turned off together when test is
completed.
OPERATING
Temperature of defrosting
sensor is 45°C or more
(when unit is newly
purchased or when moved)
sensor is lower than 45°C
(during power outages or
for service)
Reset to normal operation
from test mode
ORDERS
Power
ON
Compressor
ON
Freezer fan
ON
in 0.5 sec.
Power
ON
Defrosting
heater ON
Defrosting
heater OFF
in 0.5 sec.
Compressor
ON
Freezer fan
ON
in 0.5 sec.
**Pillar
heater ON
in 0.5 sec.
in 11 sec.
Pillar
heater OFF
in 5 sec.
in 10 sec.
in 0.5 sec.
Total load
ON
Compressor
ON
Freezer fan
ON
In 7 min.
In 10 min.
Initial power in Temperature of defrosting
61
**Pillar Heater only
apply in 3D/4D Models.