Netgear GSM7328Sv2 GSM7328Sv2/GSM7352Sv2 Series Managed Switch Hardware Instal - Page 16

Table, GSM7352S v2 LED Description continued

Page 16 highlights

Managed Stackable Layer 3 Switches GSM7328S v2 and GSM7352S v2 Hardware Installation Table 2-2. GSM7352S v2 LED Description (continued) LED M1, M2 High-Speed I/O Modules (1 LED per module) SFP ports SFP+ Ports (1 Link/ACT LED per port) Description XFP Module present or Stacking Adapter present and ACT LED XFP Module present LED /ACT • Off: The 10GbE Adapter is not present or present but link down with system. • Solid green: The 10GbE Adapter is present and link up with system. • Blinking green: Packets transmission or reception is occurring on the port. Stacking Adapter Link/ACT LED • Off: Stacking module is not present or present but link down wih system. • Solid green: Stacking module is present and link up with system. • Blinking green: Packets transmission or reception is occurring on the port. • Off: No SFP module link is established on the port. • Solid green: A valid 1000Mbps SFP module link is established on the port. • Blinking green: Packet transmission or reception is occurring on the port at 1000Mbps. • Solid yellow: A valid 100Mbps SFP module link is established on the port. • Blinking yellow: Packet transmission or reception is occurring on the port at 100Mbps. Note: If port 43~48 media is changed to copper, the SFP LEDs change to OFF status. SPD/Link/ACT LED: • OFF: No SFP module link is established on the port. • Solid green: A valid 10Gbps SFP+ module link is established on the port. • Blinking green:Packet transmission or reception is occurring on the port at 10Gbps. 2-6 Introduction v1.0, July 2009

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Managed Stackable Layer 3 Switches GSM7328S v2 and GSM7352S v2 Hardware Installation
2-6
Introduction
v1.0, July 2009
M1, M2
High-Speed I/O
Modules
(1 LED per
module)
XFP Module present or Stacking Adapter present and ACT LED
XFP Module present LED /ACT
Off:
The 10GbE Adapter is not present or present but link down
with system.
Solid green:
The 10GbE Adapter is present and link up with
system.
Blinking green:
Packets transmission or reception is occurring on
the port.
Stacking Adapter Link/ACT LED
Off:
Stacking module is not present or present but link down wih
system.
Solid green:
Stacking module is present and link up with system.
Blinking green
: Packets transmission or reception is occurring on
the port.
SFP ports
Off:
No SFP module link is established on the port.
Solid green:
A valid 1000Mbps SFP module link is established on
the port.
Blinking green:
Packet transmission or reception is occurring on
the port at 1000Mbps.
Solid yellow:
A valid 100Mbps SFP module link is established on
the port.
Blinking yellow:
Packet transmission or reception is occurring on
the port at 100Mbps.
Note:
If port 43~48 media is changed to copper, the SFP LEDs
change to OFF status.
SFP+ Ports
(1 Link/ACT LED
per port)
SPD/Link/ACT LED:
• OFF:
No SFP module link is established on the port.
Solid green:
A valid 10Gbps SFP+ module link is established on
the port.
Blinking green:
Packet transmission or reception is occurring on
the port at 10Gbps.
Table
2-2.
GSM7352S v2 LED Description (continued)
LED
Description