Netgear GSM7328Sv2 GSM7328Sv2/GSM7352Sv2 Series Managed Switch Hardware Instal - Page 23

Installation, Install the Switch.

Page 23 highlights

Managed Stackable Layer 3 Switches GSM7328S v2 and GSM7352S v2 Hardware Installation Installation Install the equipment in the sequence presented in this chapter, as shown below: 1. Select a Location. See "Select a Location" on page 3-4. 2. Install the Switch. See "Install the Switch" on page 3-5. 3. Check the installation. See "Check the Installation" on page 3-6 4. Apply power and check the LEDs. See "Connect to Power and Check the LEDs" on page 3-6. Hardware Installation 3-3 v1.0, July 2009

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Managed Stackable Layer 3 Switches GSM7328S v2 and GSM7352S v2 Hardware Installation
Hardware Installation
3-3
v1.0, July 2009
Installation
Install the equipment in the sequence presented in this chapter, as shown below:
1.
Select a Location.
See
“Select a Location” on page
3-4
.
2.
Install the Switch.
See
“Install the Switch” on page
3-5
.
3.
Check the installation.
See
“Check the Installation” on page
3-6
4.
Apply power and check the LEDs.
See
“Connect to Power and Check the LEDs” on page
3-6
.