Panasonic 26PEU1U6 Installation Instructions - Page 16
Checking the Drainage
View all Panasonic 26PEU1U6 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
3-5. Checking the Drainage After wiring and piping are completed, use the following procedure to check that the water will drain smoothly. For this, prepare a bucket and wiping cloth to catch and wipe up spilled water. WARNING Do not supply power to the unit until the tubing and wiring to the outdoor unit are completed. (1) Take off the tube cover and through the opening, slowly pour about 0.3 gal of water into the drain pan to check drainage. (2) Do Test Run to check the drainage after completing installation. When performing Test Run, refer to the installation instructions attached to the outdoor unit. CAUTION Be careful since the fan will start turning when checking the drainage. (3) After drain checking is finished, return the Operation Selector switch to the RUN position (ON position ) and remount the tube cover. WARNING To mount the tube cover, use 5/16" (4 × 8 mm) tapping screws. Do not use long screws as they may puncture the drain pan and cause water leakage. 5/16"(4 × 8 mm) tapping screw Tube cover Siphon Fig. 3-12 16 1BOBTPOJD@1"$J@*OEPPS6OJU@64MF