Panasonic FV-07VFH3 FV-07VFH3 Owner's Manual (English) - Page 8

Installation, Joist Mounting, Continued, Between

Page 8 highlights

INSTALLATIONⅠ(BETWEEN JOIST MOUNTING-Ⅰ) CONTINUED ③ Refer to wiring diagram (Page.6) or Fig.9, follow all the local electrical safety codes. As well as the National Electrical code (NEC),Using UL approved wire nuts, connect house power wires and control lead wires to product wires.(Fig.7) Make sure all connections are fastened firmly after wiring is finished. ④ For future inspection by qualified persons, put the lead wires into the hook after connection work.(Fig.8) ⑤ Fix the cord cover with the screws that taken off at step1. WARNING 1. Disconnect power source before working on unit. 2. When making wiring connections take care to prevent excessive slack in the wiring since a layge of current is drawn through the heater electrical wire. 3. To reduce the risk of fire, do not store or use gasoline or other flammable vapors and liquids in the vicinity of the heater CAUTION 1.High temperature, risk of fire, keep electrical cords, drapery,furnishings, and other combustibles at least 3 feet (0.9 m) from the front of the heater and away from the side and rear. 2.Mount the cord cover carefully so that lead wires are not pinched. Red to Blue to wall switch wall switch Brown to wall switch Wire nut Wire nut Hook Green to earth ground White to neutral Black to live Fig.7 Control lead wines Power wires Green wire From red wire From blue wire From brown wire Fig.8 ON/OFF HEAT/VENT (wall switch) Green White N L Black E Fig.9 6. Main body fixed. Push the main body upward into the ceiling, use 4 of the ST4.2X30self-tapping screws provided in the accessory package to fix it. (Fig.10) 7.Install plate fixed. Insert the install plates into the main body jockey for position(one of each side), use the ST4.2X10 self-tapping screws provided in the accessory package to fix them. (Fig.11) 8 Fig.10 Fig.11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

Red to
wall switch
Blue to
wall switch
Brown to
wall switch
Green to earth
ground
Wire nut
White
to neutral
Black
to
live
INSTALLATION
JOIST MOUNTING-
) CONTINUED
(BETWEEN
Refer to wiring diagram (Page.6) or Fig.9,
follow all the local electrical safety codes.
As well as the National Electrical code
(NEC),Using UL approved wire nuts,
connect house power wires and control
lead wires to product wires.(Fig.7)
Make sure all connections are fastened
firmly after wiring is finished.
8
For future inspection by qualified persons,
put the lead wires into the hook after
connection work.
(Fig.8)
Fig.7
Fig.8
Wire nut
Control
lead wines
Power
wires
Hook
HEAT
/
VENT
Fig.9
From red wire
From blue wire
From brown wire
(wall switch)
Green wire
White
ON
/
OFF
Black
E
N
L
Green
Fix the cord cover with the screws that
taken off at step1.
1. Disconnect power source before working
on unit.
2. When making wiring connections take
care to prevent excessive slack in the
wiring since a layge of current is drawn
through the heater electrical wire.
3. To reduce the risk of fire, do not store or
use gasoline or other flammable vapors
and liquids in the vicinity of the heater
WARNING
1.High temperature, risk of fire, keep electrical
cords, drapery,furnishings, and other
combustibles at least 3 feet (0.9 m) from the
front of the heater and away from the side
and rear.
2.Mount the cord cover carefully so that lead
wires are not pinched.
CAUTION
6. Main body fixed.
Push the main body upward into the ceiling,
use 4 of the ST4.2X30self-tapping screws
provided in the accessory package to fix it.
(Fig.10)
7.Install plate fixed.
Insert the install plates into the main body
jockey for position(one of each side), use the
ST4.2X10 self-tapping screws provided in the
accessory package to fix them. (Fig.11)
Fig.10
Fig.11