Weslo 750 Instruction Manual - Page 9
Cable Assembly
View all Weslo 750 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
22. Wrap the Short Cable (47) over a 90mm Pulley (34). Attach the Pulley and two Finger Guards 22 (35) to the Double "U"-bracket (42) with an M10 x 46mm Bolt (53) and an M10 Nylon Locknut (68). 53 35 35 42 68 47 34 23. Attach the end of the Short Cable (47) to the "U"bracket (43) with an M8 Washer (71) and an M8 Nylon Locknut (69). Note: Do not completely tighten the Locknut; it should be threaded onto the Cable so that two threads show past the Locknut, as shown in the inset drawing. 23 47 43 69 47 43 71 69 24. Locate the Low Cable (48). Attach the Cable 24 inside the Base (1) with an M10 x 65mm Bolt (55), two M10 Washers (70), two 10mm x 22mm Spacers (51), and an M10 Nylon Locknut (68). 55 70 48 25. Route the Low Cable (48) over a 90mm Pulley 25 (34). Attach the Pulley, a Cable Trap (36), and two Finger Guards (35) to the second set of holes from the bottom of the two Pulley Plates (44) with an M10 x 52mm Bolt (52) and an M10 Nylon Locknut (68). Make sure that the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 51 70 1 68 52 35 36 48 44 35 68 34 12 10. Insert the post on the Left Arm (7) through the hole in the Press Frame (5). Make sure the Arm is behind the indicated bracket on the Press Frame. Slide a 25mm Washer (29) over the post on the Left Arm (7). Attach an M6 x 43mm Bolt (61) to the post with an M6 Nylon Locknut (72). Make sure the Locknut and the head of the Bolt are over the edge of the Washer, as shown in the inset drawing. Press a 25mm Round Outer Cap (27) onto the top of the post on the Left Arm (7). Repeat this step with the Right Arm (6). 10 6 5 Bracket 61 Post 61 72 27 29 72 7 CABLE ASSEMBLY 11 11. See the CABLE DIAGRAM on page 17 for proper cable routing. Locate the High Cable (50). Route the threaded shaft end of the Cable up through the Top Frame (4) and over a 90mm Pulley (34). Attach the Pulley inside the Top Frame with an M10 x 65mm Bolt (55), two M10 Washers (70), two M10 x 12.5mm Spacers (37), and an M10 Nylon Locknut (68). 12. Route the High Cable (50) over a 90mm Pulley 12 (34) and down through the Top Frame (4). Attach the Pulley and a Cable Trap (36) to the bracket on the Top Frame with an M10 x 52mm Bolt (52) and an M10 Nylon Locknut (68). Make sure the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 29 50 55 4 37 34 70 37 70 68 34 52 50 36 68 4 13. Route the High Cable (50) under a 90mm Pulley 13 (34). Attach the Pulley, a Cable Trap (36), and two Finger Guards (35) to the second set of holes from the top of the two Pulley Plates (44) with an M10 x 52mm Bolt (52) and an M10 Nylon Locknut (68). Make sure that the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 9 35 52 50 44 35 36 34 68 44