Adaptec FC2101CDR2-AC Installation Guide - Page 30
Unpacking and Initial Setup, Installing the System in an Equipment Rack, Ambient Temperature, Ambient
UPC - 760884144909
View all Adaptec FC2101CDR2-AC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 30 highlights
30 Unpacking and Initial Setup When you receive your system, visually inspect the exterior of the packaging for any signs of damage. If any damage is found the carrier and Adaptec should be informed immediately, and they will advise you of the appropriate action. The cartons are sealed using packaging tape which should be cut open in the normal manner. Exercise caution when lifting out the components. At this point the contents should be verified against the packing list and Adaptec should again be notified if any discrepancies exist. Anti-static precautions must be observed before removing any of the components. Installing the System in an Equipment Rack Before installing the 2Gb SANbloc Series in an equipment rack, it is essential that the following guidelines are complied with, to ensure the safe and efficient operation of the system. The 2Gb SANbloc Series can be installed in open or closed equipment racks, with a front width of 19", by observing the environmental, electrical, and mechanical precautions described below. Ambient Temperature Installation of the rack system in a standard 19" cabinet may lead to a differential between the room ambient temperature and the internal ambient temperature of the rack environment. The operating temperature of the 2Gb SANbloc Series is between 5oC to 40oC. However, it is not recommended that the system be continuously run at these extreme temperatures. Consideration should therefore be given to ensure that the room ambient temperature is compatible with these specifications. Unpacking and Initial Setup