Belkin F1DC108H User Manual - Page 17

Example of Daisy-Chain Configuration

Page 17 highlights

INSTALLATION Table of Contents sections 1 2 3 4 Example of Daisy-Chain Configuration Getting Started Step 1: Make sure that all servers, Rack-Mount Console, and PRO3 KVM Switches are powered off and that each PRO3 KVM Switch has been assigned a unique BANK address. Step 2: Place all primary and secondary KVM switches in the desired location. cable 1 cable 2 cable 3 5 6 7 8 Primary unit (BANK 00) Secondary unit (BANK 01) Secondary unit (BANK 02) Secondary unit (BANK 03) 19" Widescreen Rack-Mount Console with Built-In PRO3 KVM Switch 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43

15
19” Widescreen Rack-Mount Console with Built-In PRO3 KVM Switch
SECTIONS
Table of Contents
1
2
6
5
4
8
7
3
INSTALLATION
Example of Daisy-Chain Configuration
Getting Started
Step 1:
Make sure that all servers, Rack-Mount Console, and PRO3 KVM
Switches are powered off and that each PRO3 KVM Switch has been
assigned a unique BANK address.
Step 2:
Place all primary and secondary KVM switches in the
desired location.
cable 1
cable 2
cable 3
Primary unit (BANK 00)
Secondary unit (
BANK 01)
Secondary unit (
BANK 02)
Secondary unit (
BANK 03)