Bowflex Revolution Assembly Manual - Page 12
Step 6, Remove plastic, wrapping from the engine., Step 7
![]() |
View all Bowflex Revolution manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
10 Step 6 Unboxing Your Bowflex Revolution® Home Gym 6-1 Lift the box up and off of the styrofoam packing. 6-2 Separate the styrofoam packing. Remove plastic wrapping from the engine. Lift box Separate styrofoam packing Styrofoam packing Step 7 Tools: • 5/16" Allen Wrench 7-1 Install one 1/2"x3/4" Allen Bolt. 7-2 Completely tighten hardware from steps 4 and 7. 1/2"x 3/4" Allen Bolt Hardware (1:1): 1/2" Washer 1 Allen Bolt (1/2" X 3/4 ") 1 Washer (1/2")
![](/manual_guide/products/bowflex-revolution-assembly-manual-6d63355/12.png)
10
Step 6
6-1
Lift the box up and off of the styrofoam packing.
6-2
Separate the styrofoam packing.
Remove plastic
wrapping from the engine.
Lift box
Styrofoam packing
Separate styrofoam
packing
Step 7
Tools:
• 5/16” Allen Wrench
7-1
Install one 1/2”x3/4” Allen Bolt
.
7-2
Completely tighten hardware from
steps 4 and 7.
Hardware (1:1):
1 Allen Bolt
(1/2” X 3/4 ”)
1 Washer
(1/2”)
1/2”x 3/4” Allen Bolt
1/2” Washer
Unboxing Your Bowflex
Revolution
®
Home Gym