Brother International BAS-411 Instruction Manual - English - Page 13
Procedures
View all Brother International BAS-411 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
3 oil 4r *SOv-p. 4 4 - 11 I. gi tg l Loi 0$ • Al'k Procedures 1) Pass the thread up through the hole of the thread guide from the stand spool. Then, pass the thread over around and up through the second hole of the thread guide according to the diagram. 2) String the thread by lifting each thread guide tension disk with a finger. 3) Pass the thread through the thread path via the thread guide tension disk. 4) Pass the thread through the thread guide, wrapping it once around around the tension disk clockwise. 5) Pass the thread through the upper hole of the 2-stage thread guide, then thread the thread breakage detector spring. 6) Put the thread on the inner thread guide through the hole of the thread take-up. Pass the thread through the inner thread guide again. 7) Put the thread into a hole of the lower thread guide, then pass it through the thread path of the needle clamp through the presser foot and finally through the eye of the needle. -9-