Cisco WS-X6148-GE-TX Hardware Installation Guide - Page 95

rack-mount kit, SFP+ transceivers

Page 95 highlights

Index Send document comments to [email protected] length B-3 supported power cords (figure) B-4 supported power cords (table) B-3 power plugs B-4 power supplies blank filler panel (figure) 1-16 description 1-14, 1-15 installing 2-25 LED descriptions 1-15 removing 2-24 power supply power supply output voltage A-2 pre-installation guidelines 2-2 options 2-2 unpacking the chassis 2-6 R rack 2-6, 2-8 rack-mount installation 2-7, 2-9 rack-mount kit contents 2-6, 2-8 records chassis serial number C-4 contact and site information C-3 site planning and maintenance C-1 required equipment chassis installation 2-5 RJ-45 connector pinouts B-2 maintaining 3-6 removing 3-4 removing a cable 3-6 specifications A-3 SFP transceivers description 3-7 installing 3-7 installing a cable 3-5 removing 3-8 removing a cable 3-9 specifications A-3 supported 1-18 site planning checklist C-2 specifications cables B-1 environmental A-1 physical A-1 transceivers A-3 T transceivers, supported SFPs. See SFP transceivers troubleshooting best practices D-2 S screw torques 2-3 SFP+ transceivers installing 3-4 installing a cable 3-5 OL-20036-02 Cisco UCS 6100 Series Fabric Interconnect Hardware Installation Guide IN-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96

Send document comments to [email protected]
Index
IN-3
Cisco UCS 6100 Series Fabric Interconnect Hardware Installation Guide
OL-20036-02
length
B-3
supported power cords (figure)
B-4
supported power cords (table)
B-3
power plugs
B-4
power supplies
blank filler panel (figure)
1-16
description
1-14, 1-15
installing
2-25
LED descriptions
1-15
removing
2-24
power supply
power supply output voltage
A-2
pre-installation
guidelines
2-2
options
2-2
unpacking the chassis
2-6
R
rack
2-6, 2-8
rack-mount installation
2-7, 2-9
rack-mount kit
contents
2-6, 2-8
records
chassis serial number
C-4
contact and site information
C-3
site planning and maintenance
C-1
required equipment
chassis installation
2-5
RJ-45 connector
pinouts
B-2
S
screw torques
2-3
SFP+ transceivers
installing
3-4
installing a cable
3-5
maintaining
3-6
removing
3-4
removing a cable
3-6
specifications
A-3
SFP transceivers
description
3-7
installing
3-7
installing a cable
3-5
removing
3-8
removing a cable
3-9
specifications
A-3
supported
1-18
site planning checklist
C-2
specifications
cables
B-1
environmental
A-1
physical
A-1
transceivers
A-3
T
transceivers, supported SFPs. See SFP transceivers
troubleshooting
best practices
D-2