D-Link DGS-3130 Quick Install Guide - Page 34
Circle the tie of the retainer around the power cord and into the locker of the retainer.
![]() |
View all D-Link DGS-3130 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
DGS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide Figure 3-5 Insert Tie Wrap into the Switch 2. Plug the AC power cord into the power socket of the Switch. Figure 3-6 Connect the power cord to the Switch 3. Slide the retainer through the tie wrap until the end of the cord. Figure 3-7 Slide the Retainer through the Tie Wrap 4. Circle the tie of the retainer around the power cord and into the locker of the retainer. 34
![](/manual_guide/products/dlink-dgs3130-quick-install-guide-8935ba1/34.png)
DGS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
34
Figure 3-5 Insert Tie Wrap into the Switch
2.
Plug the AC power cord into the power socket of the Switch.
Figure 3-6 Connect the power cord to the Switch
3.
Slide the retainer through the tie wrap until the end of the cord.
Figure 3-7 Slide the Retainer through the Tie Wrap
4.
Circle the tie of the retainer around the power cord and into the locker of the retainer.