Dell PowerApp 200 Rack Installation Guide - Page 26

Dell PowerEdge 2x50 and PowerApp 200 Systems Rack Installation Guide, back latch, green, middle

Page 26 highlights

5. Engage the back shoulder nuts in the slot just behind the back (green) latch first, followed by the middle shoulder nut in the slot near the middle (yellow) latch. Finally, engage the front shoulder nut in the front slot. 6. Push the system inward on the slide assemblies until the middle (yellow) latch clicks into place, locking the slide to the middle shoulder nut (see Figure 10). middle latch (yellow) back latch (green) )LJXUH,QVWDOOLQJWKH6\VWHPLQWKH5DFN 7. Press up on the green latches and push the chassis into the rack. 8. Tighten the captive thumbscrews on each side of the front chassis panel. 9. If present, install the optional front bezel. 12 Dell PowerEdge 2x50 and PowerApp 200 Systems Rack Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

12
Dell PowerEdge 2x50 and PowerApp 200 Systems Rack Installation Guide
5.
Engage the back shoulder nuts in the slot just behind the back (green) latch first,
followed by the middle shoulder nut in the slot near the middle (yellow) latch.
Finally, engage the front shoulder nut in the front slot.
6.
Push the system inward on the slide assemblies until the middle (yellow) latch
clicks into place, locking the slide to the middle shoulder nut (see Figure 10).
)LJXUH±¹¸º±±,QVWDOOLQJ±WKH±6\VWHP±LQ±WKH±5DFN
7.
Press up on the green latches and push the chassis into the rack.
8.
Tighten the captive thumbscrews on each side of the front chassis panel.
9.
If present, install the optional front bezel.
back latch
(green)
middle latch
(yellow)