Epson CX5400 Start Here Card - Page 4

Load Paper

Page 4 highlights

continued 5 Lower the scanner unit. The Stylus CX begins charging the ink delivery system. Charging takes about 2 minutes. The green light flashes and the Stylus CX makes various sounds. Don't turn it off while the green light is flashing or you'll waste ink. 6 Load Paper 1 Flip the feeder guard forward. 2 Slide out the edge guide. 3 Place a stack of paper against the right side of the feeder, but don't push it in. Slide the edge guide against the paper. 4 Flip the feeder guard back over the stack of paper.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

1
Flip the feeder guard forward.
2
Slide out the edge guide.
3
Place a stack of paper against the right side of the feeder,
but don’t push it in. Slide the edge guide against the paper.
4
Flip the feeder guard back over the stack of paper.
6
Load Paper
5
Lower the scanner unit.
The Stylus CX begins charging the ink delivery system.
Charging takes about 2 minutes. The green light flashes and the
Stylus CX makes various sounds. Don’t turn it off while the green
light is flashing or you’ll waste ink.
continued