Haier AB122MCERA Operation Manual - Page 24

model, AB092-162MCERA, AB182-282MCERA, AB182-282MEERA, AB302-482MCERA, AB302-482MEERA, ceiling,

Page 24 highlights

Installation Procedures 3. Ceiling Hole & Reinforcement (1) Cut and withdraw the foundation of ceiling according to the size of indoor unit. (2) After cutting an appropriate hole, reinforce the cutting area on the foundation of indoor unit, and append the rim to the ceiling to secure its foundation. In order to prevent the ceiling from vibrating, it is vital to reinforce the ceiling foundation and ensure the original levelness of the ceiling. 4. Hoisting Stud Installation • To support the weight of the unit, use barb bolts in the situation with the ceiling. In the situation with the new ceiling, use inlaid bolts, embedded bolts or other parts provided on site. Before proceeding the installation, adjust the gap between the bolts and the ceiling. • Use four M10 hoisting studs (provided on site)(when the height of the hoisting stud exceeds 0.9m, M10 studs should be used.). The gaps should be kept according to the overall drawing of the air conditioner. Make the installation according to regulations for various building structures as to ensure the safety. Use the level meter to perform the parallel installation. Ceiling SuspendingTi • Adjust the location of the nut at the lower part as to keep the gap between the washer at the lower part (provided on site) and the ceiling is Hmm. model AB092-162MCERA AB182-282MCERA AB182-282MEERA AB302-482MCERA AB302-482MEERA H(mm) 150 135 150 Situation with New Ceiling ceiling hoisting stud nut (upper) /washer (upper) I... (suspended article) washer (lower) nut (lower) (1) Install the indoor unit temporarily: attach the hoisting foot to hoisting stud. Make sure that nuts and washers should be used at two ends of the foot to secure the foot. (2) For the size of the ceiling hole, please refer to the schematic drawing at the previous page. (3) Adjust the unit to the proper installation location. (4) Check if the unit is in the horizontal level: The indoor unit is equipped with a built-in drainage pump and a floater switch. Check if the 4 angles of the unit are in the horizontal level with the water level or the polythene tube with water, as shown in the figure, water level taking only one indoor unit as an example. If the unit polythene tube inclines opposite to the direction of condensate flow, the floater switch might have faults, causing water dropping. (5) Tighten the nut on the washer. Situation with Original Ceiling (1) Install the indoor unit temporarily: attach the hoisting foot to hoisting stud. Make sure that nuts and washers (provided on site) should be used at two ends of the foot to secure the foot. (2) Adjust the height and location of the unit. (3) Perform Step 4 and 5 in Situation with New Ceiling. nut (provided on site) washer \hoisting foot \washer tightening (dual nuts) [secure hoisting foot] [secure washer foot] 22

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

Installation
Procedures
3.
Ceiling
Hole
&
Reinforcement
(1)
Cut
and
withdraw
the
foundation
of
ceiling
according
to
the
size
of
indoor
unit.
(2)
After
cutting
an
appropriate
hole,
reinforce
the
cutting
area
on
the
foundation
of
indoor
unit,
and
append
the
rim
to
the
ceiling
to
secure
its
foundation.
In
order
to
prevent
the
ceiling
from
vibrating,
it
is
vital
to
reinforce
the
ceiling
foundation
and
ensure
the
original
levelness
of
the
ceiling.
4.
Hoisting
Stud
Installation
To
support
the
weight
of
the
unit,
use
barb
bolts
in
the
situation
with
the
ceiling.
In
the
situation
with
the
new
ceiling,
use
inlaid
bolts,
embedded
bolts
or
other
parts
provided
on
site.
Before
proceeding
the
installation,
adjust
the
gap
between
the
bolts
and
the
ceiling.
Use
four
M10
hoisting
studs
(provided
on
site)(when
the
height
of
the
hoisting
stud
exceeds
0.9m,
M10
studs
should
be
used.).
The
gaps
should
be
kept
according
to
the
overall
drawing
of
the
air
conditioner.
Make
the
installation
according
to
regulations
for
various
building
structures
as
to
ensure
the
safety.
Use
the
level
meter
to
perform
the
parallel
installation.
Ceiling
Suspending
T
i
Adjust
the
location
of
the
nut
at
the
lower
part
as
to
keep
the
gap
between
the
washer
at
the
lower
part
(provided
on
site)
and
the
ceiling
is
Hmm.
Situation
with
New
Ceiling
model
H(mm)
AB092-162MCERA
150
AB182-282MCERA
AB182-282MEERA
135
AB302-482MCERA
AB302-482MEERA
150
ceiling
hoisting
stud
nut
(upper)
/washer
(upper)
I
...
(suspended
article)
washer
(lower)
nut
(lower)
(1)
Install
the
indoor
unit
temporarily:
attach
the
hoisting
foot
to
hoisting
stud.
Make
sure
that
nuts
and
washers
should
be
used
at
two
ends
of
the
foot
to
secure
the
foot.
(2)
For
the
size
of
the
ceiling
hole,
please
refer
to
the
schematic
drawing
at
the
previous
page.
<After
finishing
the
installation
of
the
ceiling>
(3)
Adjust
the
unit
to
the
proper
installation
location.
(4)
Check
if
the
unit
is
in
the
horizontal
level:
The
indoor
unit
is
equipped
with
a
built-in
drainage
pump
and
a
fl
oater
switch.
Check
if
the
4
angles
of
the
unit
are
in
the
horizontal
level
with
the
water
level
or
the
polythene
tube
with
water,
as
shown
in
the
figure,
taking
only
one
indoor
unit
as
an
example.
If
the
unit
inclines
opposite
to
the
direction
of
condensate
fl
ow,
the
fl
oater
switch
might
have
faults,
causing
water
dropping.
(5)
Tighten
the
nut
on
the
washer.
Situation
with
Original
Ceiling
(1)
Install
the
indoor
unit
temporarily:
attach
the
hoisting
foot
to
hoisting
stud.
Make
sure
that
nuts
and
washers
(provided
on
site)
should
be
used
at
two
ends
of
the
foot
to
secure
the
foot.
(2)
Adjust
the
height
and
location
of
the
unit.
(3)
Perform
Step
4
and
5
in
Situation
with
New
Ceiling.
water
level
nut
(provided
on
site)
washer
polythene
tube
\hoisting
foot
\washer
tightening
(dual
nuts)
[secure
hoisting
foot]
[secure
washer
foot]
22