Haier AB122MCERA Operation Manual - Page 30
Ab122-182meera
View all Haier AB122MCERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 30 highlights
Installation Procedures (Tubing Permissible Length & Height Difference( Please refer to the attached manual of outdoor units. (Tubing Materials & Specifications) Model Tubing Size (mm) Tubing Material AB092MCERA Gas pipe Liquid pipe 09.52 06.35 AB122-182MCERA AB242-482MCERA AB122-182MEERA AB242-482MEERA 012.7 015.88 06.35 09.52 Phosphor deoxybronze seamless pipe (TP2) for air conditioner (Refrigerant Filling Amount) Add the refrigerant according to the installation instruction of outdoor unit. The addition of R410A refrigerant must be performed with a measure gage to ensure the specified amount while compressor failure can be caused by filling too much or little refrigerant. (Connecting Procedures of Refrigerant Tubing) Proceed the flare tube connecting operation to connect all the refrigerant tubes. • Dual wrenches must be used in the connection of indoor unit tubing. • Mounting torque refers to the right table Outer Diameter of Tubing (mm) Mounting Torque (N-m) Increase mounting Torque (N-m) 06.35 11.8(1.2kgf-m) 13.7(1.4kgf-m) wrench 09.52 012.70 24.5(2.5kgf-m) 49.0(5.0kgf-m) 29.4(3.0kgf-m) 53.9(5.5kgf-m) 015.88 78.4(8.0kgf-m) 98.0(10.0kgf-m) (Cutting and Enlarging) Cutting or enlarging pipes should be proceeded by installation personnel according to the operating criterion if the tube is too long or flare opening is broken. (Vacuumizing Vacuumize from the stop valve of outdoor units with vacuum pump. Refrigerant sealed in indoor machine is not allowed to use for vacuumization. (Open All Valve Open all the valves of outdoor units. [NB: oil balancing stop valve must be shut up completely when connected one main unit.] (Checkup for Air Leakag Check if there is any leakage at the connecting part and bonnet with hydrophone or soapsuds. CConnecting Connecting circular terminals: 1. Connecting circular terminals: The connecting method of circular terminal is shown in the Fig. Take off the screw, connect it to the terminal tier after heading it through the ring at the end of the lead and then tighten it. 2. Connecting straight terminals: The connection methods for the circular terminals are shown as follows: loosen the screw before putting the line terminal into the terminal tier, tighten the screw and confirm it has been clamped by pulling the line gently. 3. Pressing connecting line After connecting line is completed, press the connecting line with clips which should press on the protective sleeve of the connecting line. correct pressing terminal tier -pressing clip_ wrong pressing 28