Haier HBF05EBSS Product Manual - Page 10
Step 1, Step 2, Step 3, Step 4
UPC - 688057300108
View all Haier HBF05EBSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
English STEP 1 DO NOT TURN ON GAS YET Connect the CO2 regulator to tank by screwing regulator nut onto threaded tank valve. HAND C02 Regulator TIGHTEN ONLY - it is not necessary to use a wrench to tighten this nut. At this point make sure that both the shut off (black) valves are in the off (sideways) position. STEP 2 Attach one red gas hose to each of the shut off valve Clamp outlets on the bottom of the regulator and clamp tight Red using two of the white squeeze clamps provided. Hose C02 Cylinder STEP 3 Attach the other end of each red gas hose to the LARGER of the two hose barbs on the keg coupler and secure with the remaining two white squeeze clamps. Keg Coupler Large Barb STEP 4 Locate the two clear hoses from the draft arm installed previously. (These should be inside the refrigerator at this point). Attach one clear beer hose to the SMALLER hose barb on each keg coupler being certain to push the hose completely onto the barb. This connection does not require a white squeeze clamp. Clear Hose Small Barb 9