HP Indigo 10000 Peak Season Baseline - Page 8

Reference Run, Baseline Preparations

Page 8 highlights

4. In case an update is needed, Windows will indicate the update. 5. Select Install updates. 6. At the end of installation, restart the press computer. 7. Repeat the steps above to verify if other updates are available. Reference Run Print a reference jobs before performing the baseline procedure, review the PQ and keep the printed sheets for comparison for after the baseline. ● Print CATP (10 copies duplex) ● Grey 20 (10 copies) ● Customer job (if relevant - ask the operator) Baseline Preparations Follow these steps for the baseline preparations. 1. Replace blanket and impression paper if necessary (depends on the PQ and the life span). 2. Replace PIP using the PARS system to check if it is working well (depends on the PQ and the life span). 3. Perform ILS and SPM self-calibration. 4. Run first transfer. 5. Run Bid Engage wizard 6. Remove all active bypasses and interlocks. 7. Check all open calls status - close / handle / monitor the open calls as much as possible. 6 Chapter 2 Baseline checklist tasks

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

4.
In case an update is needed, Windows will indicate the update.
5.
Select
Install updates
.
6.
At the end of installation, restart the press computer.
7.
Repeat the steps above to verify if other updates are available.
Reference Run
Print a reference jobs before performing the baseline procedure, review the PQ and keep the printed sheets
for comparison for after the baseline.
Print CATP (10 copies duplex)
Grey 20 (10 copies)
Customer job (if relevant - ask the operator)
Baseline Preparations
Follow these steps for the baseline preparations.
1.
Replace blanket and impression paper if necessary (depends on the PQ and the life span).
2.
Replace PIP using the PARS system to check if it is working well (depends on the PQ and the life span).
3.
Perform ILS and SPM self-calibration.
4.
Run first transfer.
5.
Run Bid Engage wizard
6.
Remove all active bypasses and interlocks.
7.
Check all open calls status - close / handle / monitor the open calls as much as possible.
6
Chapter 2
Baseline checklist tasks