HP ProLiant DL380 Compaq ProLiant DL380 Generation 2 Server High-Density Deplo - Page 27
Third-Party Rack Cabinet Solution and Cable Management Arm, Telco Rack Solution
View all HP ProLiant DL380 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
Compaq ProLiant DL380 Generation 2 Server High-Density Deployment in Compaq Racks 27 Compaq Confidential - Need to Know Required 4. The ProLiant DL380 Generation 2 server ships with rack rails and a cable management arm. Remove the server rails from the standard rack rails and attach them to the server. Attach the cable management arm to the rear of the server before installing the server in a rack. Refer to the Compaq ProLiant DL380 Generation 2 Server Setup and Installation Guide and the rack option documentation for detailed installation instructions. Third-Party Rack Cabinet Solution and Cable Management Arm The standard rack rails and cable management arm that are included with the ProLiant DL380 Generation 2 server are required for the third-party Rack Cabinet option kit. Before deploying ProLiant DL380 Generation 2 servers into a third-party rack, install the slide rail assembly on the third-party rack rail. For detailed instructions on deploying ProLiant DL380 Generation 2 servers into a third-party rack, refer to the documentation that ships with the thirdparty rack-mounting kit (P/N 228894-B21). IMPORTANT: Read the Compaq Ultra-Dense Server Deployment in Third-Party Cabinet Racks before deploying ProLiant DL380 Generation 2 servers in a third-party rack. Telco Rack Solution The Telco Rack kit includes replacement server rails designed to fit on the ProLiant DL380 Generation 2 server. Before deploying ProLiant DL380 Generation 2 servers into a Telco rack, remove the standard server rails and replace them with the Telco server rails included in the Telco Rack kit. For detailed instructions on deploying ProLiant DL380 Generation 2 servers into a Telco rack, refer to the documentation that ships with the Telco rack-mounting kit (P/N 228892-B21). IMPORTANT: Read Compaq Ultra-Dense Server Deployment in Third-party Cabinet Racks or Compaq Ultra-Dense Server Deployment in Telco Racks before deploying ProLiant DL380 Generation 2 servers in a third-party rack or Telco rack. Installing Power Distribution Units PDU installation varies depending on the rack configuration, the number of servers deployed in the rack, the selected type of PDU, and the voltage and current rating for each PDU. The 295363-xxx series of PDUs must be mounted vertically in the side panels of the rack. See the "Power Distribution Units" section for information about the Vertical-Mount PDU Bracket kits available from Compaq. The installation card in the Vertical-Mount PDU Bracket kit contains detailed instructions for installing the Vertical-Mount PDU Brackets on a PDU and in a rack. Positioning PDUs in 36U and 42U Racks The position of the PDUs in the rack side panels varies depending on the rack size, the number of servers deployed in the rack, and the cable management solution. As a rule, install PDUs from the bottom to the top on the same side of the rack as the cable management arm (viewing the rack from the front). Installing PDUs in a 36U or 42U Rack Before installing PDUs in a 36U or 42U rack, you may need to remove the center support bracket and center it between the PDUs. Install the PDUs on the same side of the rack as the cable 14UH-0701A-WWEN