HP ProLiant DL380 Compaq ProLiant DL380 Generation 2 Server High-Density Deplo - Page 31
Installing a Server in a Rack
View all HP ProLiant DL380 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
Compaq ProLiant DL380 Generation 2 Server High-Density Deployment in Compaq Racks 31 Compaq Confidential - Need to Know Required Installing a Server in a Rack Install ProLiant DL380 Generation 2 servers in the rack from the bottom to the top. Tighten the thumbscrews on the front of each server to secure the server to the rack. Attach the cable management arm to the rear of the server and to the rear of the rack. WARNING: To reduce the risk of serious personal injury, fire, or damage to the equipment: • Extend the leveling jacks to the floor and rest the full weight of the rack on the leveling jacks. • Either install the stabilizer kit or couple multiple racks together for stability. • Load the heaviest item first and load the rack from the bottom to the top. Loading the rack in this manner makes the rack "bottom-heavy" and helps prevent the rack from becoming unstable. • Do not overload the AC supply branch circuit that provides power to the rack. • Extend only one ProLiant DL380 Generation 2 server at a time. A rack may become unstable if more than one ProLiant DL380 Generation 2 server is fully extended for any reason. 14UH-0701A-WWEN