HP StorageWorks 2/140 director 2/140 rack mount kit installation instructions - Page 11

Installation Instructions, Rack Mount Kit Checklist, Mounting Hardware - storageworks 20

Page 11 highlights

Installation Instructions This section describes the procedures used for installing a StorageWorks Director 2/140 in an appropriate HP, or comparable, 19-inch Electronic Industries Association (EIA) rack: • HP 9000 series, 10000 series and 11000 series racks • HP rack system/e or 19-inch EIA rack Rack Mount Kit Checklist This section describes the contents of the rack mount kit as well as tools or equipment required to complete the installation. Mounting Hardware • Twenty-six (26) Phillips panhead screws (10-32 x 1/2) with split lock and flat washers (only 20 required) • Twelve (12) Phillips flathead countersunk screws (10-32 x 3/8). • Twelve (12) cage nuts • Eight (8) self-tapping sheet metal screws (10-32 x 1/2). director 2/140 rack mount kit installation instructions 1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

1
director 2/140 rack mount kit installation instructions
Installation Instructions
This section describes the procedures used for installing a StorageWorks Director
2/140 in an appropriate HP, or comparable, 19-inch Electronic Industries Association
(EIA) rack:
HP 9000 series, 10000 series and 11000 series racks
HP rack system/e or 19-inch EIA rack
Rack Mount Kit Checklist
This section describes the contents of the rack mount kit as well as tools or equipment
required to complete the installation.
Mounting Hardware
Twenty-six (26) Phillips panhead screws (10-32 x 1/2) with split lock and flat
washers (only 20 required)
Twelve (12) Phillips flathead countersunk screws (10-32 x 3/8).
Twelve (12) cage nuts
Eight (8) self-tapping sheet metal screws (10-32 x 1/2).