Installation Instructions Moving the Director 2/140 Use these steps to position the Director 2/140 next to the rack. WARNING: Two people will need to work together to transfer the Director 2/140 to the lift. Make sure the wheels of the lift cannot roll as you transfer the Director 2/140 to the lift. Move the Director 2/140 slowly and carefully onto the lift to prevent back and hand injury. Dropping the Director 2/140 could injure personnel or damage the equipment. 1. Position the lift device next to the Director 2/140. 2. Using a pallet jack, raise the pallet on which the Director 2/140 is mounted to the same height as the top surface of the lift device. 3. Slide the Director 2/140 across from the pallet to the lift device. 4. Determine the appropriate rack-mount position. Remember that the Director 2/140 is 20 inches or 12 U high. Installing the Shelf Brackets in the Rack The procedure for installing shelf brackets varies depending on the type of rack. Select the appropriate procedure for your rack type: • "Installing the Shelf Brackets in HP 9000, 10000 and 11000 Series Racks" on page 4. • "Installing Shelf Brackets in an HP Rack System/e or 19-inch EIA Rack" on page 7. Installing the Shelf Brackets in HP 9000, 10000 and 11000 Series Racks Use these steps to install the two shelf brackets in an HP 9000, 10000 or 11000 series rack. 1. Determine the appropriate placement for the Director inside the rack. NOTE: HP strongly recommends installing the Director 2/140 in the lowest position in the rack. 2. Along an exterior vertical rail of the rack cabinet, determine the position of the bottom of the shelf bracket and count 1 U up from this location. 4 director 2/140 rack mount kit installation instructions

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

Installation Instructions
4
director 2/140 rack mount kit installation instructions
Moving the Director 2/140
Use these steps to position the Director 2/140 next to the rack.
WARNING:
Two people will need to work together to transfer the Director 2/140
to the lift. Make sure the wheels of the lift cannot roll as you transfer the Director
2/140 to the lift. Move the Director 2/140 slowly and carefully onto the lift to
prevent back and hand injury. Dropping the Director 2/140 could injure
personnel or damage the equipment.
1.
Position the lift device next to the Director 2/140.
2.
Using a pallet jack, raise the pallet on which the Director 2/140 is mounted to the
same height as the top surface of the lift device.
3.
Slide the Director 2/140 across from the pallet to the lift device.
4.
Determine the appropriate rack-mount position. Remember that the Director
2/140 is 20 inches or 12 U high.
Installing the Shelf Brackets in the Rack
The procedure for installing shelf brackets varies depending on the type of rack. Select
the appropriate procedure for your rack type:
Installing the Shelf Brackets in HP 9000, 10000 and 11000 Series Racks
” on
page 4.
Installing Shelf Brackets in an HP Rack System/e or 19-inch EIA Rack
” on
page 7.
Installing the Shelf Brackets in HP 9000, 10000 and 11000
Series Racks
Use these steps to install the two shelf brackets in an HP 9000, 10000 or 11000 series
rack.
1.
Determine the appropriate placement for the Director inside the rack.
NOTE:
HP strongly recommends installing the Director 2/140 in the lowest position in the rack.
2.
Along an exterior vertical rail of the rack cabinet, determine the position of the
bottom of the shelf bracket and count 1 U up from this location.