HP Xw25p Rapid Deployment Pack Windows Edition User Guide 3.70 - Page 36

Using a specific ProLiant Support Pack version

Page 36 highlights

initial deployment job, 17 installation settings Red Hat Linux, 23 Windows, 21 Integrated Administrator, 5 Integrated Lights-Out, 5 J Job default settings, 21 jobs customizing, 29 server deployment, 20 server deployment toolbox, 20 server replication, 20 virtual machine, 31 virtual machine deployment toolbox, 20 K kickstart files customizing, 31 L Linux customizing kickstart files, 31 scripted install, 20 Linux kickstart files, 32 Linux Kickstart files modifying, 32 M Modifying a Create Virtual Machine job, 32 Modifying the Windows unattend text file, 32 N NIC, Integrated Administrator, 5 O online resources, 33 operating system deploying, 14, 15 operating systems, 30 P pasting files, 30 jobs, 29 Physical Devices view configuring, 5 Preboot eXecution Environment booting, 9 ProLiant Integration Module, customizing, 29 R rack name, 5 RAID settings, 21 Red Hat Linux customizing kickstart files, 31 installation settings, 23 scripted install, 20 redeployment option, 17 reference server, creating, 12 Related documents, 33 remote management, 5 renaming files, 30 jobs, 29 rip-and-replace, 17 run job option, 17 S SAN-attached scripted install jobs, 7 scripted install customizing, 20 scripted install, 7 scripted installs, 7 SmartStart Scripting Toolkit, configuring hardware, 21 Software support, 34 SUSE Linux customizing control files, 31 scripted install, 20 U unattend text file modifying, 32 unattend text files customizing, 30 Understanding the Deployment Server, 20 usage scenario, 9 Using a specific ProLiant Support Pack version, 31 V virtual machines customizing jobs, 31 VMware customizing kickstart files, 31 scripted install, 20 Index 36

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37

Index 36
initial deployment job, 17
installation settings
Red Hat Linux, 23
Windows, 21
Integrated Administrator, 5
Integrated Lights-Out, 5
J
Job default settings, 21
jobs
customizing, 29
server deployment, 20
server deployment toolbox, 20
server replication, 20
virtual machine, 31
virtual machine deployment toolbox, 20
K
kickstart files
customizing, 31
L
Linux
customizing kickstart files, 31
scripted install, 20
Linux kickstart files, 32
Linux Kickstart files
modifying, 32
M
Modifying a Create Virtual Machine job, 32
Modifying the Windows unattend text file, 32
N
NIC, Integrated Administrator, 5
O
online resources, 33
operating system
deploying, 14, 15
operating systems, 30
P
pasting
files, 30
jobs, 29
Physical Devices view
configuring, 5
Preboot eXecution Environment
booting, 9
ProLiant Integration Module, customizing, 29
R
rack name, 5
RAID settings, 21
Red Hat Linux
customizing kickstart files, 31
installation settings, 23
scripted install, 20
redeployment option, 17
reference server, creating, 12
Related documents, 33
remote management, 5
renaming
files, 30
jobs, 29
rip-and-replace, 17
run job option, 17
S
SAN-attached scripted install jobs, 7
scripted install
customizing, 20
scripted install, 7
scripted installs, 7
SmartStart Scripting Toolkit, configuring hardware, 21
Software
support, 34
SUSE Linux
customizing control files, 31
scripted install, 20
U
unattend text file
modifying, 32
unattend text files
customizing, 30
Understanding the Deployment Server, 20
usage scenario, 9
Using a specific ProLiant Support Pack version, 31
V
virtual machines
customizing jobs, 31
VMware
customizing kickstart files, 31
scripted install, 20