Intel SR2520SAXR User Guide - Page 94
Cable Routing SR2520SAF/SR2520SAFR
UPC - 735858197335
View all Intel SR2520SAXR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 94 highlights
Cable Routing (SR2520SAF/SR2520SAFR) When you add or remove components from your server system, make sure your cables are routed correctly before reinstalling the server system cover. Use caution to make sure no cables or wires are pinched and that the airflow from the fans is not blocked. Use the figures below to determine the correct cable routing. H MLK G A A C CPU 2 B F I C CPU 1 J PON G R D Q E B G E D F A Server Board B Power Supply C System Fans D Optical Drive E Floppy Disk Drive F Front Panel Board G Hard Disk Drive Bays A Power to Server Board (Main) B Power to Server Board (CPU) C Power to Server Board (Auxiliary) D Front Panel USB E Front Panel F Optical Device Data Cable G Optical Device Power H Fan #1 Power I Fan #2 Power J Fan #3 Power K HDD 0 to Server Board SATA 0 L HDD 1 to Server Board SATA 1 M HDD 2 to Server Board SAS 0/SATA 2 N HDD 3 to Server Board SAS 1/SATA 3 O HDD 4 to Server Board SAS 2/SATA 4 P HDD 5 to Server Board SAS 3/SATA 5 Q USB Floppy R Hard Drive Power Figure 59. Cable Routing (SR2520SAF/SR2520SAFR) AF001664 72 Intel® Server System SR2520SA User's Guide