LG TD-V10021E User Guide - Page 22

ELEcTRic, DRYERS {cont.

Page 22 highlights

INSTALLATIONINSTRUCTIONS cONNEcTiNG ELEcTRic DRYERS {cont.) USA ONLY WARN|NG: • Connect the power cord to the terminal block. Each colored wire should be connected to same color screw. Wire color indicated on manual is connected to the same color screw in block. Failure to follow these instructions may result in a short or overload. • Grounding through the neutral conductor is prohibited for: (1) new branch-circuit installations, (2) mobile homes, (3) recreational vehicles, and (4) areas where local codes prohibit grounding through the neutral conductor. Four-wire Connection for Electric Dryers: Direct wire • A 4-wire connection is required for all mobile and manufactured home installations, as well as all new construction after January 1, 1996. A UL-listed strain relief is required. = Use UL-listed 4-wire #10 AWG=minirnurn copper conductor cable. = Allow at least 5 ft (1.5 m) length to allow for removal and reinstallation of the dryer. 1" (2.5 cm) I-4 Ground Wire 5" (12.7 cm) J Remove 5 inches (12.7 cm) of the outer covering from the wire. Remove 5 inches of insulation from the ground wire. Cut off approximately 11/2inches (3.8 cm) from the other three wires and strip 1 inch (2.5 cm) insulation from each wire. Bend the ends of the three shorter wires into a hook shape. Terminal Block UL-Listed Strain Relief UL-Listed 4P-oWwierer Cord Remove the terminal block access cover on the upper back of the dryer. Install a UL-listed strain relief into the power cord through-hole; then thread the power cable prepared in Step 1 through the strain relief. Hot N_ Black) (White) (Red) Ground Wire Transfer the dryer's ground wire from behind the green ground screw to the center screw of the terminal block. Attach the two hot leads of the power cable to the outer terminal block screws. Attach the white neutral wire to the center terminal block screw. Attach the power cable ground wire to the green ground screw. TIGHTEN ALL SCREWS SECURELY. Reinstall the terminal block access cover. 22

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124

INSTALLATION
INSTRUCTIONS
cONNEcTiNG
ELEcTRic
DRYERS {cont.)
USA
ONLY
WARN|NG:
• Connect
the
power
cord
to
the
terminal
block.
Each
colored
wire
should
be
connected
to
same
color
screw.
Wire
color
indicated
on
manual
is
connected
to
the
same
color
screw
in
block.
Failure
to
follow
these
instructions
may
result
in
a short
or
overload.
• Grounding
through
the
neutral
conductor
is
prohibited
for:
(1) new
branch-circuit
installations,
(2) mobile
homes,
(3) recreational
vehicles,
and
(4) areas
where
local
codes
prohibit
grounding
through
the
neutral
conductor.
Four-wire
Connection
for
Electric
Dryers:
Direct
wire
• A 4-wire
connection
is required for all mobile
and manufactured
home installations,
as well
as all new construction
after January
1, 1996.
A UL-listed
strain relief is required.
= Use UL-listed
4-wire
#10 AWG=minirnurn
copper
conductor
cable.
= Allow at least 5 ft (1.5 m) length to allow for
removal and reinstallation
of the dryer.
1"
(2.5 cm)
I-4
Ground
Wire
5"
(12.7 cm)
Remove 5 inches (12.7 cm) of the outer
covering
from the wire. Remove 5 inches
of insulation
from the ground
wire. Cut off
approximately
11/2inches (3.8 cm) from the
other three wires and strip 1 inch (2.5 cm)
insulation
from each wire. Bend the ends of
the three shorter
wires into a hook shape.
J
Terminal
Block
UL-Listed
Strain
Relief
UL-Listed
4-Wire
Power
Cord
Remove
the terminal
block access
cover
on the upper back of the dryer. Install a
UL-listed
strain relief into the power
cord
through-hole;
then thread the power
cable
prepared
in Step 1 through
the strain relief.
Hot
N_
...............................
(Black)
(White)
(Red)
Ground
Wire
22
Transfer the dryer's ground wire from behind
the green ground
screw to the center
screw
of the terminal
block. Attach the two hot
leads of the power cable to the outer terminal
block screws.
Attach the white neutral wire
to the center terminal
block
screw. Attach the
power
cable ground
wire to the green ground
screw. TIGHTEN ALL SCREWS
SECURELY.
Reinstall the terminal
block access
cover.